Questions # 451:

An innovation project with a budget of over US$30 million is expected to have a large impact on the technology industry. The business area is concerned if the project will meet stakeholder expectations and raised this concern with the project manager.

What should the project manager do to manage business concerns and expectations before starting the project?

Options:

A.

Meet with the project finance team to measure market variations and product impact.


B.

Direct the project team to estimate user stories in greater detail.


C.

Ask the product owner to prioritize the backlog items based on the return on investment (ROI).


D.

Request that the project team develop a release plan and roadmap for the project.


Expert Solution
Questions # 452:

A project manager works in an organization that embraces using different project approaches. The project manager's current project uses a

predictive approach with clear requirements. A few months following the kickoff, the project manager notices that the virtual development teams

are not communicating enough, and coordination is becoming an issue. The teams are not aligned on the tasks being done or the current

impediments.

What should the project manager do?

Options:

A.

Ask the members to be more proactive and share ideas with each other.


B.

Set up a daily virtual meeting with the development team.


C.

Plan a monthly virtual meeting to align and to review the plans.


D.

Review the issue with the project sponsor and ask for support.


Expert Solution
Questions # 453:

The current incremental revenue expected by a project deliverable is not fulfilling the business case requirement The deliverable was already closed and handed over to the operations team

Which two actions should the project manager take? (Choose two)

Options:

A.

Review the issue with project sponsor and submit a change request


B.

Report the issue to the product manager and business segments


C.

Analyze the business benefits criteria and assumptions


D.

Discuss the issue with the operations team to assess expense overruns


E.

Schedule a project review meeting to analyze the root cause


Expert Solution
Questions # 454:

A key team member has recently gone through some personal issues that has affected their performance. The project manager noticed that the

team member's emotional situation has affected the rest of the team's performance.

How should the project manager handle this situation?

Options:

A.

Help all team members learn to deal with their emotions by building a culture of empathy.


B.

Separate the key team member and replace them while they emotionally recover.


C.

Meet with the team to discuss how to handle the performance problem.


D.

Ask the human resources (HR) department for their support providing emotional help.


Expert Solution
Questions # 455:

A junior project manager was recently hired to lead a complex project scheduled to kick off in 2 weeks. The junior project manager was introduced to another project

manager for mentoring.

Which two benefits will the junior project manager realize by being assigned to a mentor? (Choose two)

Options:

A.

The junior project manager reports administratively to their mentor so that human resource (HR) questions can be answered quickly.


B.

The junior project manager can discuss certain problems with their mentor without fear of retribution.


C.

The mentor will be immediately available to take over the project if there are problems or project delays.


D.

The mentor will be involved in the decision-making processes implemented by the junior project manager.


E.

The mentor can provide past project documentation with early warning indicators that potential problems could occur.


Expert Solution
Questions # 456:

Just as a team reaches a mutual consensus on a preferred design, a stakeholder submits a request to add new features that enhance the

company’s competitive advantage. What should the project manager do?

Options:

A.

Reject all requested changes and bypass the company's change control process.


B.

Encourage the project team to add premium features to impress the client.


C.

Start the process to include the new features of the product on the next iteration.


D.

Allow all requested changes and bypass the company's change control process.


Expert Solution
Questions # 457:

A defect is identified during user acceptance testing that could significantly impact the system's performance. The project team has advised that this defect puts the delivery date at risk.

Which risk management process should be performed?

Options:

A.

Plan Risk Responses, to outline the possible options to bypass the system performance issue


B.

Perform Qualitative Risk Analysis, to assess the extent of the system performance impact


C.

Monitor Risks, to install system performance monitoring tools and update the risk register


D.

Perform Quantitative Risk Analysis, to outline the details of the system performance issues


Expert Solution
Questions # 458:

A project team is globally distributed with team members living and working in different time zones. The project manager is trying to get the team

to collaborate effectively.

Which three actions should the project manager take to accomplish this goal? (Choose three)

Options:

A.

Require the team to have daily mandatory meetings with the project management office (PMO).


B.

Recommend the use of formal written documentation in all project communications.


C.

Review the communications strategy with the team regularly with a view for continuous improvement.


D.

Send out a survey to review the preferred method, time frequency for communications.


E.

Compile a communications management plan with input from all stakeholders and distribute for review and approval.


Expert Solution
Questions # 459:

A project manager has taken over a project that has been without a project manager for the last couple of weeks. The team is feeling lost and there are a few team

members who are confused about the next steps and the final outcome of the project.

What should the new project manager do?

Options:

A.

Avoid conflict and let the team self-organize on how they want to work on the project tasks.


B.

Ask the project sponsor to provide team members with a project direction regarding outcomes.


C.

Set short-term goals in order to create a winning culture internally and praise team members for achieving them.


D.

Escalate the situation to the steering committee and request that more time be allotted to the project.


Expert Solution
Questions # 460:

A project manager is working with a team that is new to agile. One of the more

influential stakeholders struggles with the nature of agile. The project manager knows that this

stakeholder is needed as an advocate and wants to do everything possible to make the

stakeholder comfortable with the project.

What should the project manager include in the status report to illustrate the project's

performance?

Options:

A.

Results of the MoSCoW assessment


B.

Cost-benefit analysis


C.

Return on investment (ROI) analysis


D.

Earned value analysis (EVA)


Expert Solution
Questions # 461:

At the end of a project, one of the suppliers is facing financial difficulties and is

pushing the project manager to obtain financial, legal, and administrative approval in order to

communicate formal project closure and ensure the transfer of liability. What should the

project manager do next?

Options:

A.

Compare the achieved results to the contract requirements.


B.

Make the final payment as the project is completed.


C.

Transfer the remaining variances and close the project.


D.

Escalate to higher management to expedite the approval.


Expert Solution
Questions # 462:

A project manager is leading an electrical project that spans five towns. The project

manager is informed by the team that one of the towns is not allowing the team to work there even though the town was included in stakeholder engagements before the start of the project.

What should the project manager do?

Options:

A.

Change the project scope and seek approval to exclude this town from the overall

project.


B.

Engage with the town's authorities to discuss the reason for the change in commitment

and agree on a solution.


C.

Instruct the team to move to the next town and continue the project to avoid further delays.


D.

Retrieve all minutes of stakeholder engagements and send to the town as a reminder of their commitment to the project.


Expert Solution
Questions # 463:

A company is moving to a hybrid approach and conducted capacity activities for all of the project managers. During these capacity-building activities, the focus was on agile approaches and team facilitation skills. When starting the implementation phase, the project managers faced issues motivating the newly hired agile staff.

Why are the project managers having issues motivating the agile staff?

Options:

A.

The capacity building activities missed the servant leadership concept transfer.


B.

Transitional periods normally cause this type of problem.


C.

The agile staff is not used to being led by a project manager.


D.

Project managers are expected to become coaches in agile teams.


Expert Solution
Questions # 464:

Organizational downsizing has resulted in the key subject matter expert (SME) resource leaving a multiyear project. What should the project manager do?

Options:

A.

Update the stakeholder register.


B.

Refer to the resource management plan.


C.

Consult the project sponsor.


D.

Modify the statement of work (SOV).


Expert Solution
Questions # 465:

A project manager works at an organization that is transitioning to agile The development team has recommended using a burndown chart to provide visibility on project progress to all stakeholders.

What should the project manager do to ensure effective communication throughout the project?

Options:

A.

Advise the project management office (PMO) to use the burndown chart as the single communication channel.


B.

Develop a communications management plan for each category in the stakeholder register.


C.

Include the burndown chart in a monthly report that is distributed to all stakeholders.


D.

Postpone the recommendation since the organization does not currently have a defined agile methodology.


Expert Solution
Questions # 466:

A project manager is leading a project in which key performance Indicators (KPls) are measured through earned value management (EVM). Match each measurement on the left with the correct category on the right.


Expert Solution
Questions # 467:

A project is in the execution phase During a few planning sessions the team brought up dependencies and risks based on their knowledge of other project. The project manager also received questions from the company in terms of how and when the team planned to perform acceptance testing and training activities

What should the project manager do next?

Options:

A.

Document the project management plans and share them with the company and all team members via email for review


B.

Create a log to track risks assumptions issues and dependencies and establish a periodic review with the stakeholders


C.

Add contingency m the schedule to account for dependencies and risks then review rt with the team


D.

Engage with the company and the project team to determine the best course of action


Expert Solution
Questions # 468:

A company's board of directors announced that a major layoff will occur at the end of the month. When evaluating the impact the protect manager found that 25°© of the project team members are part of the layoff

What should the project manager do first?

Options:

A.

Request a meeting with the project sponsor to discuss the viability of the project and determine the next actions


B.

Request a meeting with the customer and discuss trade-offs to reduce the scope and product quality as a result of the lack of personnel


C.

Request a meeting with the finance department to increase the budget of the project to hire temporary personnel to perform the affected activities


D.

Request a meeting with the human resources (HR) department and demand they find a solution to retain the project team members


Expert Solution
Questions # 469:

A project manager primarily works on implementation projects Depending on the deliverable, the project manager is able to estimate the time line based on previous projects. The project manager now receives a project that is different from the previous implementation projects.

What should the project manager do next?

Options:

A.

Refer to the previous protect they worked on and base the estimate on that


B.

Use expert judgment to estimate the schedule and then adjust the schedule as the project progresses


C.

Ask the project management office (PMO) by when the project can be completed and use that date as the project time line


D.

Break down the project into smaller tasks and estimate the durations of the activities


Expert Solution
Questions # 470:

A project manager is leading an automation project. The project team is colocated

and includes people from both the technical and business units. The project manager

discovers that personal differences and work styles are affecting the project negatively.

How should the project manager address this?

Options:

A.

Develop a schedule that ensures people with personal differences work separately.


B.

Use an approach to the project that does not involve colocation.


C.

Meet with the team and agree on expectations from team members.


D.

Invite the functional managers of the different units to address their personal differences.


Expert Solution
Questions # 471:

A protect manager has just finished planning for a project when the client adds a new project team member The project manager Knows that the new team member only works remotely and is not in the main office. In addition, the new team member engages with decisions quickly in a face-to-face environment, but is slow to respond otherwise.

How should the project manager reflect this in their planning?

Options:

A.

Send out recurring onsite project meeting invites to ensure the team member's presence.


B.

Update the project charter to include the new team member for this project.


C.

Monitor the new team member's input to gauge their value to the project.


D.

Include the team member in the stakeholder register and update the communications management plan.


Expert Solution
Questions # 472:

A project manager is assigned to deliver an innovative solution that is part of a

brand new offering. The project manager reviews the request for proposal (RFP) and realizes that key terms are restricted to technical resource assignments. There is also a gap in addressing compliance.

How should the project manager bridge the gap and ensure the project delivers the expected

business value?

Options:

A.

Determine the critical requirements.


B.

Document the risks and mitigations.


C.

Define the project schedule.


D.

Create a project scope statement.


Expert Solution
Questions # 473:

A project has recently Kicked off. The project manager observes that thete are different expectations among the project team members. These growing misunderstandings are affecting team productivity.

Which document should the project managefve?

Options:

A.

Project charter


B.

Stakeholder register


C.

Team charter


D.

Project organization charts


Expert Solution
Questions # 474:

An equipment vendor will implement a new production line for a client company. The year-long project will include 2- to 4-month long iterations; however, the client's project manager has no agile experience.

How should the project manager ensure that the client is effectively represented in the daily meetings?

Options:

A.

Recommend agile training programs that best suit the client project manager's schedule.


B.

Realign the project to a predictive approach to ensure optimal collaboration between the teams.


C.

Propose a session tor essential agile Knowledge transfer for the client team to align with the daily meeting goals


D.

Provide the client project manager with agile best practice documents and web resources.


Expert Solution
Questions # 475:

A team lead has been highly engaged and involved in a project and is operating without a chain of command or authority levels What is the team lead dang1?

Options:

A.

Modeling directive leadership


B.

Modeling commanding leadership


C.

Modeling adaptive leadership


D.

Modeling servant leadership


Expert Solution
Questions # 476:

A project manager is leading a hybrid project. The self-organizing teams are

continually late in delivering their demos, resulting in low morale. The steering committee is

familiar with the reporting and planning associated with a predictive approach and is

concerned about the project because it is unclear if the expected value will be delivered.

What should the project manager do?

Options:

A.

Emphasize to the teams the importance of reaching the agreed deadlines and value.


B.

Request to coach the team to ensure motivated project team members are on board.


C.

Update the project schedule with a buffer to reflect the expected delays being incurred

by the team.


D.

Suggest to the teams to limit the scope of work per iteration so they will start to deliver

more reliably.


Expert Solution
Questions # 477:

A project manager is managing the development of a dental wire bending machine. The machine is compatible with the three most popular dental wires in the market which covers 90°.© of the market The prototype is now under testing for certification. The manufacturer of one of the three wires announced they will be producing a different wire mat will be incompatible with the machine. This will result in a 25% loss of market coverage from the initially predicted 90% coverage

What should the project manager do?

Options:

A.

Investigate the impact of this issue with the team and survey the market for alternative wires with similar characteristics


B.

Stop the project and kick off another project to apply alternative wires for the machine


C.

Meet with the sales and marketing representatives and ask them to convince the manufacturer to reconsider


D.

Meet with the wire manufacturer to secure enough of the existing stock for the machine


Expert Solution
Questions # 478:

A project manager submits several requests to purchase required hardware and

knows from previous experience that this kind of procurement usually results in disputes

between the company and its suppliers. How can the project manager mitigate this risk in the

request for proposal (RFP) with suppliers?

Options:

A.

Ask the legal team to review the RFP.


B.

Ask the project team to submit the RFP.


C.

Request approval of the RFP from the project sponsor.


D.

Request approval of the RFP from management.


Expert Solution
Questions # 479:

A junior project manager is excited to start working on their first project with a telecommunications company, A senior project manager has decided to educate the junior project manager on the challenges of project management and how to achieve success.

Which three artifacts should the senior project manager tell the junior project manager to utilize to ensure project success? (Choose three)

Options:

A.

Organizational process assets (OPAs)


B.

Lesson learned registers from past projects


C.

Historical issue logs


D.

Project scope statement


E.

Project management plan


Expert Solution
Questions # 480:

us graph describes the current performance of a protect in relation to cost and schedule. What should the project manager do to bring the project back on track?

Options:

A.

Review project cost because the project is over budget and ahead of schedule


B.

Review project schedule and cost because the project is over budget and behind schedule


C.

Review project schedule because the project is under budget and behind schedule


D.

Review project scope because the project is under budget and ahead of schedule


Expert Solution
Questions # 481:

A project manager is managing two integrated projects in a program A key integration point is misaligned, which has resulted in delays. One of the team's integration leads is a subject matter expert (SME) m this integration area. The other team's integration lead is not a SME but is more senior and has worked on the project longer Both team leads are blaming each other

What should the project manager do first to resolve this situation?

Options:

A.

Assign the resolution of the issue to the senior integration lead who has worked on the project longer


B.

Meet with both integration leads to understand the root cause and determine a resolution


C.

Escalate the issue to the program architect who developed the integration plan


D.

Assign the resolution of this issue to the integration lead who is a SME


Expert Solution
Questions # 482:

During the executing phase, a project manager is reviewing the issue log and finds

there are outstanding high-priority issues that are still open. Most of the open issues require

effort from external domain experts who are not on the project team.

What should the project manager do?

Options:

A.

Ask the issue reporter to close the issues, because there are no project team members

who have the required domain knowledge.


B.

Review the open issues with the issue reporter and issue a change request to hire an

external domain expert.


C.

Request that the project team members learn the required domain knowledge and

resolve the open issues in a short time.


D.

Reduce the project scope to ensure that the project team has the knowledge to deliver

the system on schedule.


Expert Solution
Questions # 483:

A project manager is managing a hybrid project. There is software in place to access the repository of project artifacts However a few stakeholders are reporting that they are unable to find the latest project schedule

What should the project manager do?

Options:

A.

Advise the project management office (PMO) that there is a resource gap for sharing project artifacts effectively


B.

Escalate the issue to the steering committee and ask them to deal with the stakeholders' lack of training


C.

Make sure all stakeholders have access to the system and know where to find project artifacts


D.

Send the project schedule via email to the stakeholders who need that information


Expert Solution
Questions # 484:

A protect manager is managing a project that will handle sensitive data for millions of users The sponsor mentioned that, lo their knowledge, the project does not seem to have any compliance requirements in their country.

What should the project manager do in this situation?

Options:

A.

Request expert advice from the compliance leader to confirm if there are any compliance requirements for the project.


B.

Check with The national compliance agency to determine if the project has any compliance requirements in this country


C.

Trust in the expertise of the sponsor and believe that there are no compliance requirements for this project.


D.

Conduct independent research regarding the data protection policy of the country for legal and regulatory compliance.


Expert Solution
Questions # 485:

A project manager finds that there are knowledge gaps in the project team relating to the core competencies required to deliver the desired results. What should the project manager do to achieve the desired results?

Options:

A.

Communicate the situation to the team and plan for the necessary training and coaching arrangements


B.

Report the situation back to upper management and request to have the scope changed


C.

Plan to hire more experienced team members and lay off a few of the existing team members.


D.

Communicate the situation to the customer and inform them about potential delays in delivery.


Expert Solution
Questions # 486:

A hybrid project team is working on an upgraded version of software for their

product owner. The team is also responsible for supporting the existing product and

customers. For the last three sprints, the team had to stop their project work and focus on

major support items for the product owner. The testers are struggling to cope with the

constant changes to the plan, which has resulted in a number of emotional outbursts.

How should the project manager proceed?

Options:

A.

Request a replacement for those team members who are unhappy with this way of

working.


B.

Schedule a session with the product owner to explain that no support items can be

taken into the sprints going forward.


C.

Ask human resources (HR) to send the team members to a change management

workshop.


D.

Schedule a session with the team to discuss the issues and work with them to define a

plan to manage the sprints going forward.


Expert Solution
Questions # 487:

A key project stakeholder does not attend any of the project meetings and is

providing false information that the project team is not delivering on time. What should the

project manager do to address this situation?

Options:

A.

Create a new communication artifact for the key stakeholder.


B.

Email the latest status report to the key stakeholder.


C.

Share the meeting recordings with the key stakeholder.


D.

Discuss communication needs with the key stakeholder.


Expert Solution
Questions # 488:

A project manager is working on a large project in another country and realizes that

only a few people from the project team are working on all of the releases. What should the

project manager do to prevent this in the future?

Options:

A.

Document the risk register in the project charter.


B.

Speak to the customer and add the issue to the issue log.


C.

Review user roles and update the team charter.


D.

Involve the product owner to rewrite the user stories.


Expert Solution
Questions # 489:

A financial company is developing a new application for mobile banking using a hybrid approach The project is delayed as the product concept has not yet been developed to the key stakeholder s satisfaction despite multiple design iterations. The key stakeholder has now started participating in all daily standups. The project manager has observed that the key stakeholder's presence has had a negative impact on the team's morale, while also impacting productivity

How should the project manager ensure that the stakeholder s issues are addressed effectively without impacting the team?

Options:

A.

Set up a meeting with the stakeholder to address their concerns directly


B.

Move to a predictive design-and-requirements gathering approach


C.

Talk to the team separately to address the stakeholder's concerns


D.

Schedule a team retrospective and invite the stakeholder


Expert Solution
Questions # 490:

During the forming phase of a project team a project manager implements several team-building initiatives and decides it would be fun to have improvisations theater activities. After the sessions the project manager received feedback from some key team members who felt that although the activity was fun it was not appropriate for the purpose of team building.

What should the project manager have done to avoid this negative feedback'?

Options:

A.

Assessed and analyzed personality indicators from the project team


B.

Sent the activity details to everyone involved prior to the session


C.

Communicated the decision to conduct this activity to the key team stakeholders


D.

Selected a vendor for the activity according to the procurement management plan


Expert Solution
Questions # 491:

A project manager has been assigned to a new project. There is one team member

who never says anything during meetings. After meetings, however, the team member sends

detailed emails with very good suggestions that help with project execution.

How should the project manager guide the team members?

Options:

A.

Review the communications management plan with the team members.


B.

Remind the team members to follow the team charter.


C.

Motivate the team members to speak freely in the meeting.


D.

Arrange a team-building activity to involve all team members.


Expert Solution
Questions # 492:

In an ongoing project, stakeholders have been approaching team members for status

reports and changes without consulting the project manager. What should the project

manager do to ensure a successful project?

Options:

A.

Send the project charter to all stakeholders for information.


B.

Send an email to all stakeholders directing them to approach the project manager

directly.


C.

Review the stakeholder engagement plan and inform the stakeholders.


D.

Review the change management plan and ask the change control board (CCB) to be

involved.


Expert Solution
Questions # 493:

A project manager notices that the response action for an identified issue is insufficient for solving the problem What should the project manager do next?

Options:

A.

Include the issue in the risk register and update the team


B.

Document the continuing issue and failed solution


C.

Inform the stakeholders about the failure and update the issue log


D.

Meet with the project team to find another solution


Expert Solution
Questions # 494:

On a project with multiple international locations, a trend for delays has been

flagged. When looking into the issue, the project manager realized that some of the key

activities were scheduled over the holiday periods in the overseas offices.

What should the project manager do next?

Options:

A.

Update the schedule to reflect the holidays and share the workload among offices to

mitigate schedule slippage.


B.

Hire additional personnel on a temporary basis to cover the extra workload during the

holiday seasons.


C.

Request that the offices in overseas locations work overtime to mitigate schedule

slippages.


D.

Update the schedule to reflect the holidays and notify the project sponsor of the

delayed completion.


Expert Solution
Questions # 495:

A project manager has been assigned lo an important agile project During protect execution, a vendor was approved to produce the project deliverables. What should the project manager do to ensure project continuity between the vendor and the team?

Options:

A.

Request that the vendor provides a manual with all required knowledge


B.

Implement retrospectives with the vendor to gather the required knowledge


C.

Submit a change request to extend the vendor's contract to provide formal training for the team


D.

Conduct daily knowledge transfer standups to ensure that the team is properly trained


Expert Solution
Questions # 496:

A project manager learns from a marketing analyst that a competitor just published a press release announcing a product launch using a specific innovation The project manager is concerned because the company is initiating a project involving the same innovation A key goal of the new project is that the product will be the first to market won the innovation

What should the project manager do next?

Options:

A.

Document the issue in the issue log and escalate to the project sponsor


B.

Inform the project sponsor and suggest canceling the project


C.

Review the project goals and eat criteria m the project charter


D.

Ask the leader of research and development to decide on next steps


Expert Solution
Questions # 497:

A new privacy law will go into effect at the beginning of the next calendar year. The project manager realizes the project needs to be compliant with the new law. What should the project manager do next?

Options:

A.

Inform the project steering committee of this constraint.


B.

Inform the project team and create a spike for the next Iteration.


C.

Inform the legal department that the project scope will be updated.


D.

Inform the product owner that the project will continue as planned.


Expert Solution
Questions # 498:

Throughout an entire project, the project manager took notes at every meeting with

team members. These notes provided useful insights from key stakeholders, which later

resulted in increased value to the project. The project manager thought it would be helpful to

keep these notes as a future reference for other project managers within the organization.

Where should the notes be located?

Options:

A.

Lessons learned


B.

Organizational process assets (OPAs)


C.

Enterprise environmental factors (EEFs)


D.

Project management plan


Expert Solution
Questions # 499:

An engineer working on a project team has tasks that require an additional skill that the engineer does not have a designer on the team is experienced with this skill from previous jobs and is willing to teach this skill even though it is not part of the current work

What should the project manager do?

Options:

A.

Escalate the situation to the engineer's manager


B.

Request external training for the engineer


C.

Request external training for the engineer and designer


D.

Allow the engineer and designer to cross-train with each other


Expert Solution
Questions # 500:

The start of a 12-month project has been delayed by 2 months The project has a fixed budget, deadline and product specifications. What should the project manager do next?

Options:

A.

Schedule a time to negotiate a trade-off regarding the quality of the product with the customer


B.

Meet with the risk manager to identify potential threats related to the schedule delay.


C.

Set up a meeting with the project sponsor and submit a change request to the scope of the product


D.

Start the project plan for the scope and quality and identify options to deliver and meet stakeholders expectations


Expert Solution