Questions # 101:

An experienced project manager is managing a multi-million dollar agile project The project manager communicates the ground rules to the team but after 12 iterations, the project manager starts noticing that some team members are not following the ground rules.

What should the project manager do first to ensure team adherence to the ground rules?

Options:

A.

Schedule a meeting with the project team to reinforce the ground rules.


B.

Notify the project sponsor about this behavior and ask the sponsor to take disciplinary action


C.

Contact human resources to request a written warning letter be sent to team members not following the ground rules.


D.

Ask the functional manager to replace team members not following the ground rules


Expert Solution
Questions # 102:

A project manager is managing a project to develop a new tool Because of the nature of the project, the project manager decides to use an agile approach One of the identified risks becomes an issue when the project manager finds out that another company patented a very similar tool.

What should the project manager do to address this issued

Options:

A.

Schedule a meeting with critical stakeholders to review the issue and decide on the next steps


B.

Put the project on hold and release the resources until the issue is resolved


C.

Inform the product owner and log the issue in the risk register to monitor closely for next steps.


D.

Contact the company that owns the patent of the similar tool to compare the similarities and differences with the current project.


Expert Solution
Questions # 103:

A project manager at a company is considering a high-performing junior member of the organization to be the new project manager for a current project. What should the project manager do to prepare for a recommendation to senior management?

Options:

A.

Compile key highlights featuring the team member from the meeting minutes.


B.

Ask the team member to write a short biography listing their qualifications


C.

Gather project artifacts that demonstrate the team member's high performance


D.

Calculate the health of the projects on which the team member has worked


Expert Solution
Questions # 104:

A global petroleum crisis has affected the distribution of crude oil in the region where the construction project is underway Materials are not being delivered on time and this phase of construction is already behind for what was initially planned.

What should the project manager do first to prevent the project from going further off track?

Options:

A.

Perform a risk assessment and define a risk response action plan.


B.

Proceed with the project using management reserves to cover any delays or losses.


C.

Propose a pause in this phase to save labor costs and asset depreciation.


D.

Establish new partnerships with other suppliers in anticipation of any delays.


Expert Solution
Questions # 105:

The project velocity has recently slipped, and a decision was made to skip testing to increase the momentum and bong the project back on track What will the project manager need to focus on as a result of this decision?

Options:

A.

Increased bum rate


B.

Increased cost


C.

Increased technical debt


D.

Decreased efficiency


Expert Solution
Questions # 106:

The change control board (CCB) rejects a change request submitted by a subject matter expert (SME) The SME refuses to accept this rejection and does not want to continue the project without the change

What should the project manager have done to avoid this situation?

Options:

A.

Requested that the sponsor approved the change request first.


B.

Assessed the change's overall impact to the project before submission


C.

Ensured that the change request was aligned with the project scope


D.

Submitted the change request directly to the CCB


Expert Solution
Questions # 107:

A project manager has been assigned to an education project with the objective of training a workforce in application development One of the deliverables is to provide internships to the best students in the customer's active projects However the customer does not have enough projects in progress right now The project manager decides to create several internal projects in order to ensure the internships

Which three actions should the project manager take to fulfill this scenario without adding costs for the customer? (Choose three)

Options:

A.

Use the project's contingency budget


B.

Create a change request with the scope of the new internal projects.


C.

Influence the client to initiate a new project.


D.

Create a work breakdown structure (WBS) of the new scope with the internal projects


E.

Manage the quality of the delivery


Expert Solution
Questions # 108:

After reviewing the project management plan with key stakeholders, the project manager was told that an 18-month release plan was unacceptable and the product should launch in six months. Based on the new timeline, what should the project manager do?

Options:

A.

Plan for overtime apply crashing and fast tracking and share the risk of failure with project stakeholders


B.

Review the project backlog looking for high-priority items and come up with a minimum viable product (MVP) that fits the expected timeline


C.

Seek approval with the sponsor to triple the project budget, hiring more people to compensate for the compressed schedule


D.

Go over the critical path with stakeholders, explaining why it is not possible to deliver all the scope in the expected timeline


Expert Solution
Questions # 109:

The city has decided to build a new tram station The project will include various approaches The construction and infrastructure work will be accomplished using a predictive life cycle while software will be developed using an iterative life cycle Some neighbors are resisting the project have been asking the mayor to stop the project, and are threatening legal action

What two actions should the project manager take'? (Choose two)

Options:

A.

Discuss with the construction team alternatives on moving the new train station to another location.


B.

Publish information on the city’s website about the benefits that the new tram station will bring


C.

Have a meeting with the mayor and explain the importance of the new train station to the city.


D.

Conduct regular meetings with the neighbors to get their buy-in for the project


E.

Register this situation as a risk and develop a mitigation plan


Expert Solution
Questions # 110:

A project manager has team members around the world in many different time zones Project work frequently stalls because people in one office need to wait until another office is awake to have questions answered.

What should the project manager have done to avoid this?

Options:

A.

Used communication tools, such as video conferencing so different offices could communicate.


B.

Learned more about how each team member prefers to communicate before assigning project work


C.

Planned and scheduled tasks and work packages to overcome geographical and time zone challenges


D.

Ensured that the project would be the highest priority for all team members


Expert Solution
Questions # 111:

Stakeholders in some industries prefer to deal with programmers and system analysts directly, bypassing project managers. This complicates managing resources on projects

How should a project manager solve this issue?

Options:

A.

Propose implementing a new project management information system (PMIS).


B.

Request a meeting with senior management to escalate the situation


C.

Promote adoption of the communications management plan with the project team.


D.

Host a team-building event to develop team cohesion and improve communication


Expert Solution
Questions # 112:

A new resource has joined an iterative project team The project manager notices that the resource is unable to complete the deliverables on time

How should the project manager address this situation?

Options:

A.

Address the lack of performance by coaching the new team member


B.

Discuss options to improve performance with the resource manager


C.

Provide performance feedback as part of the retrospective ceremony.


D.

Request a more efficient replacement resource from the project sponsor


Expert Solution
Questions # 113:

During the last sprint review the product owner stated that the product does not deliver any value The project manager believes that the product meets all the provided specifications

The team is confused by the product owner's statement

What should the project manager do when using a hybrid approach?

Options:

A.

Escalate the matter to the executive board so they can decide on next steps


B.

Prioritize the project backlog and ask the development team to fix the issues


C.

Review the project's benefits management plan with the product owner.


D.

Ask the product owner to terminate the project as it is no longer aligned to the expected benefits


Expert Solution
Questions # 114:

During the design phase of a project the project manager notices that the schedule performance index (SPI) is 1 8 and the cost performance index (CPI) is 0 1 In a weekly meeting with top management, the project manager reports concerns about these indicators However the most concerned person was the project sponsor who said that if the trend continues, they will be forced to prematurely close the project

What should the project manager do?

Options:

A.

Monitor the project sponsor but understand that it is normal to spend more money in the design phase of a project.


B.

Stop crashing the schedule


C.

Manage the project sponsor closely and revise the project's resource management plan to improve indicators


D.

Use a resource-levelling technique


Expert Solution
Questions # 115:

A member of the board of directors is the sponsor of a project that is important to the organization This stakeholder has many other priorities and is not currently engaged in the project activities

How should the stakeholder be engaged in the project?

Options:

A.

Keep the stakeholder informed and consult with them based on their needs


B.

Involve the stakeholder in governance and decision making


C.

Consult with the stakeholder and increase their level of interest


D.

The stakeholder needs to be made aware of the project progress


Expert Solution
Questions # 116:

A project manager receives an update that the development flow is not going well. Some team members cannot start their work because the delivery is late. Looking at the Kanban board and the work in progress (WIP) lines, the project manager observes a bottleneck.

Click the title of the queue in the Kanban board below that requires additional resources to relieve the bottleneck


Expert Solution
Questions # 117:

A project team has recently completed the initial sprint for developing an automated payroll system for a company The project manager has scheduled a sprint planning meeting with the product owner and team members to discuss which features should be worked on next

Which two pieces of information does the project manager need in order to make this meeting productive and effective? (Choose two)

Options:

A.

Sprint charter


B.

Burndown chart


C.

Company mission and vision


D.

Product backlog


E.

Sprint goal


Expert Solution
Questions # 118:

A team has been struggling with various issues during the course of an iteration. The project lead facilitates a discussion of the issues and the team forms new team agreements. During the next iteration, some of the same issues appear again

What should the project lead do next?

Options:

A.

Notify senior management of the issues and have them review the importance of agreements with the team


B.

Challenge the team to determine if the issues surfaced again because agreements were not followed


C.

Post the agreements in a conspicuous place where all of the team members can see them.


D.

Let the team self-organize and determine the best means to prevent the issues from occurring again


Expert Solution
Questions # 119:

A key stakeholder for a construction project has been spending a lot of time at the site and interrupting the team's efforts What should the project manager do in this situation?

Options:

A.

Work to understand the key stakeholder's concerns and provide feedback in regular project status reports


B.

Arrange an ad hoc meeting to address the key stakeholder's concerns with team members


C.

Reinforce with the key stakeholder that the project is performing on schedule\


D.

Escalate the situation to the project sponsor because the key stakeholder's behavior is impacting progress


Expert Solution
Questions # 120:

The client will not agree to closure, claiming that the project team has not performed the code inspections mandated in the development contract. The project team has performed the code inspections, however the records are not complete What should the project manager do?

Options:

A.

Seek expert legal advice on the interpretation of the clauses in the contract


B.

Hold a meeting with the project team project sponsor and the client to agree to the further work required to close the project and add to lessons learned


C.

Close the project and hand over the deliverables to the client


D.

Hold a lessons learned workshop with the project team and project sponsor to avoid contractual compliance issues arising in future projects


Expert Solution
Questions # 121:

After the project charter's approval the project manager needs to work on detailed project requirements, constraints and assumptions with stakeholders However, not all of the stakeholders are immediately available for a meeting in the short term.

What should the project manager do in order to gather the information needed from stakeholders?

Options:

A.

Email, call, or meet with each stakeholder separately to obtain their input


B.

Conduct a meeting to build the project management plan with the stakeholders who are available


C.

Escalate to the project sponsor that not all stakeholders are available for a meeting


D.

Meet with the project management team to build the project management plan before consulting stakeholders


Expert Solution
Questions # 122:

During the execution phase of a healthcare IT project, stakeholders made a change request regarding user requirements There is no remaining budget available to cover that change request.

What should the project manager do next?

Options:

A.

Discuss approval of the change request in the next project meeting


B.

Perform a risk assessment on the required change request.


C.

Evaluate the change request against the project scope statement


D.

Ask the sponsor for more funds to cover the change request


Expert Solution
Questions # 123:

During the design phase, a project manager realizes that the project will benefit from using adaptive tools The effectiveness of this approach has been proven in past projects inside the organization

What should the project manager do first?

Options:

A.

Update project documents to include adaptive tools and artifacts and plan the first iterative session


B.

Contact the project sponsor and request new team members who are familiar with adaptive projects


C.

Confirm team capabilities before introducing adaptive tools and artifacts to the project


D.

Freeze the design stage and look for an external resource to run iterative design at extra cost


Expert Solution
Questions # 124:

After a couple of iterations the project manager decides to present the product to a key stakeholder The stakeholder's feedback is that the team missed the mark on many features

What should the project manager do to avoid this in the future?

Options:

A.

Set up requirements-gathering sessions with all key stakeholders to evaluate the scope once again and reprioritize the backlog based on the sessions.


B.

Schedule adequate sprint demos to gather early feedback from the stakeholders and adapt the plan accordingly


C.

Incorporate design thinking practices into the project life cycle to better understand the product's personas and be more effective to match their needs.


D.

Evaluate the team's skills to look for someone with experience in product design and assign that person the task of rebuilding the product interface


Expert Solution
Questions # 125:

A company's CEO has just returned from a conference on the use of artificial intelligence (Al) and would like the project manager to implement this technology in the organization What should the project manager do first?

Options:

A.

Start developing a business case.


B.

Start a strengths, weaknesses, opportunities and threats (SWOT).


C.

Engage stakeholders and allocate resources


D.

Gather requirements from stakeholders


Expert Solution
Questions # 126:

A team member shares with their functional manager some negative details about the performance of another team member that was discussed during the retrospective. The project manager finds out about this discussion

What two actions should the project manager take? (Choose two)

Options:

A.

Contact the team member's functional manager and invite them to the next retrospective


B.

Meet with the entire team to review the ground rules about safe environments


C.

Meet with the product owner to talk about the situation.


D.

Contact the team member to explain what information can be shared outside the team


E.

Meet with the sponsor to review the situation.


Expert Solution
Questions # 127:

During a retrospective review, many project team members say they are not completing tasks during the iterations because of interruptions and requests for help from other teams As a team facilitator, what should the project manager do to avoid this?

Options:

A.

Identify the problem's root causes and define the ground rules with all project team members to minimize interferences


B.

Hire a coach to help all project teams to improve their abilities to solve problems on

their own.


C.

Reunite with the project team members affected and tell them not to reduce the team's capacity


D.

Recommend to the project team members that they should improve their planning

and make their stones smaller


Expert Solution
Questions # 128:

A project manager is assigned to a global project where, during the planning process, team members from different regions are not agreeing to collaborate with each other What should the project manager do?

Options:

A.

Review lessons learned from previous projects that used the same team


B.

Review the organizational culture, structure, and governance


C.

Coordinate a meeting to understand the situation and resolve any conflicts.


D.

Coordinate a meeting with regional managers to ask for support


Expert Solution
Questions # 129:

A large project is affecting the neighborhood in which it is located The neighbors are not satisfied with the project and their resistance to the project may affect the project deadline

What two actions should the project manager take'? (Choose two)

Options:

A.

Send letters to the neighbors and ask them kindly not to disturb the project.


B.

Set up a meeting with neighborhood representatives to win their cooperation


C.

Analyze the situation and find out what is causing the neighborhood's negative attitude.


D.

Ask the customer to extend the project deadline to allow time for conflict resolution


E.

Ask the mayor of the city to use their authority to stop neighborhood resistance


Expert Solution
Questions # 130:

A junior staff member was recently assigned to the team. The new team member tells the project manager that they are confused because they are not familiar with what is expected of them on the project

What should the project manager do to assist the new team member?

Options:

A.

Advise the new team member to enroll in project management training.


B.

Instruct the new team member to review the responsible, accountable consult, and inform (RACI) matrix before asking for help


C.

Advise the new team member to review the project charter and stakeholder engagement plan.


D.

Review the resource management plan and provide mentoring to the new team member if necessary


Expert Solution
Questions # 131:

A product owner presented the backlog to the team, and the team raised concerns over implementing some of the features due to various impediments What should the project manager suggest that the product owner do next?

Options:

A.

Ensure that the impediments are captured and prioritized based upon the highest valued features


B.

Estimate the financial impact of the impediments and request additional funding


C.

Begin to remove the impediments, starting with the easiest ones first, to foster team accomplishment


D.

Capture the impediments and inform management that their assistance is needed

in resolving the impediments


Expert Solution
Questions # 132:

A project team is engaging a development team in another country to develop software. During progress reviews, the project manager identified completion date delays due to rework because there were different interpretations of the client's needs.

What should the project manager do?

Options:

A.

Set up a meeting with key stakeholders to clarify requirements


B.

Escalate to the project steering committee and request additional time


C.

Travel to the development team's office to push the schedule


D.

Create prototypes with the development team to confirm requirements


Expert Solution
Questions # 133:

An agile project is running activities to define the minimum viable product (MVP) During the session, the project manager identifies some mandatory regulations but there is no consensus to include these regulations in the MVP because it may extend the duration of the project

What should the project manager do?

Options:

A.

Train the team on the new regulations as requested by management


B.

Get commitment from the team to include all of the required regulations


C.

Ask the project sponsor to add more time to the project.


D.

Share with participants the need to focus only on product functionality


Expert Solution
Questions # 134:

The project is delayed due to the high amount of major changes requested by different stakeholders at different stages of the project If the project continues on the same path, it will consume twice the time and budget planned.

What two actions can the project manager take to be more cost effective? (Choose two)

Options:

A.

Conduct a stakeholder analysis.


B.

Reinforce team communication.


C.

Update the project management plan with the new timeline


D.

Adopt an incremental approach


E.

Leverage work between team members


Expert Solution
Questions # 135:

A multinational company has a plan to expand their business into a new country where they currently have no presence A project manager is assigned to initiate this project

After reviewing the business case, what should be considered first when developing an appropriate implementation strategy?

Options:

A.

Acquire project resources from the new country to mitigate the risk of uncertainty


B.

Evaluate the environmental and regulatory factors and identify high-level risks and assumptions


C.

Identify and monitor the risks closely since the company does not have lessons learned for this country.


D.

Ensure that project sponsors are in agreement on the project deliverables and timeline during the project


Expert Solution
Questions # 136:

A project manager has two projects that are being executed at the same time The duration of the critical project must be reduced, but the project manager does not have enough resources to achieve this goal In addition, the schedule does not have activities that can be overlapped

What should the project manager do?

Options:

A.

Analyze both projects to determine the most effective use of common resources


B.

Use resource optimization to justify requesting more resources for the critical project


C.

Provide schedule optimization training to the project teams to improve their skills.


D.

Apply fast-tracking techniques to compress the schedule of the critical project


Expert Solution
Questions # 137:

During the execution of a project the project manager notices that only one team member has one of the technical skills needed to build the product The project manager is afraid this might have a future impact on the quality and schedule because most of the upcoming activities will require at least three people with this specific skill.

What two actions should the project manager take to prevent the team from being unqualified? (Choose two)

Options:

A.

Exclude the activities from the roadmap


B.

Encourage working in pairs and knowledge sharing


C.

Teach the entire team the new skill.


D.

Facilitate a training event with an external trainer


E.

Increase the time estimates on the activities that require such abilities


Expert Solution
Questions # 138:

The product owner decides to launch a product after a couple of releases knowing that the minimum viable product (MVP) lacks some features One of the key stakeholders the marketing vice president is not happy with the results and questioned the release decision.

What should the project manager do?

Options:

A.

Support the product owner's decision and seek better alignment with this stakeholder in order to avoid this type of issue in the future


B.

Coach the team on the decision-making process, assuming a risk-averse strategy towards product releasing


C.

Assume the responsibility for product releases making the final call on when something is ready for customer launch


D.

Escalate the issue to the sponsor questioning the authority of the key stakeholder regarding the product launch decision


Expert Solution
Questions # 139:

A project manager joins a team that is providing a customized enterprise resource planning (ERP) system to a client A potential design problem is identified by the development team After reviewing this issue with the project owner and team members, all agreed to revise the design to avoid a system defect when deployed The design is already approved.

What should be the project manager's next steps?

Options:

A.

Conduct a proof of concept to make sure there are no problems in the revised design


B.

Amend the design specifications and pass them to the development team for reprogramming


C.

Make a change request and get format approval from the project owner


D.

Inform the client of the problem and follow the change request process


Expert Solution
Questions # 140:

A project manager is leading a project which shows a trend to exceed the cost baseline What should the project manager do first to manage the budget?

Options:

A.

Ask the project sponsor for assistance in getting the budget back on track


B.

Meet with the project team to analyze the actual cost to determine deviations


C.

Inform the stakeholders that the project will be finished over budget.


D.

Issue a change request including the analysis to increase the budget


Expert Solution
Questions # 141:

A few months into a project, several schedule issues have emerged Drag the schedule problems on the left to the specific tools on the right that if implemented during schedule development could have prevented the issues.


Expert Solution
Questions # 142:

A hospital is running a project for one of their internal critical systems to manage billing patient data and record management along with consultation reports and input from physicians The project manager now needs to categorize the identified risks

Drag each risk type on the left to its correct example on the right

Question # 142


Expert Solution
Questions # 143:

A team has different ideas on how to address a feature of a product under construction and; although the sprint began two days ago, they have still not reached a consensus. What should the project manager do?

Options:

A.

Ask the product owner, who is the key stakeholder, to choose among the different ideas.


B.

Propose ideas to the group, ask everyone to vote, and then choose the most popular idea


C.

Schedule a session to give everyone the chance to express their opinions about each idea, then vote and decide.


D.

Offer an opinion about the pros and cons of each idea and try to reach a consensus in a facilitated meeting


Expert Solution
Questions # 144:

The project team follows a hybrid framework for its delivery. During the execution of a project, the team learns of a new compliance requirement that has to be delivered before any other requirements

How should the project manager address this situation?

Options:

A.

Ask the team to include the compliance requirement in the current sprint and deliver it.


B.

Add the new compliance requirement to the backlog as the technical team does not have any capacity.


C.

Include the compliance lead in the stakeholders list and wait for the next status meeting


D.

Collaborate with the compliance team member to review and prioritize the requirement’s delivery


Expert Solution
Questions # 145:

A project manager meets with external stakeholders to explain the objectives and outline expectations for a new project. A key stakeholder appears to support the project, with the condition that other unrelated projects will receive financial support Due to cultural sensitivities the project manager is reluctant to be direct with the key stakeholder on this matter The project cannot proceed without the support of this stakeholder.

What should the project manager do?

Options:

A.

Proceed with the project without allowing scope creep to occur


B.

Use the contingency funds to provide support for the requested projects


C.

Cancel the project since the stakeholder's request is out of scope


D.

Inform the sponsor and document the request in the stakeholder engagement plan


Expert Solution
Questions # 146:

A project manager has been selected to deliver one of an organization's key flagship solutions Critical success factors include agility, market adaptation, and a quick response to market offerings

What is one of the key activities that the project manager should undertake to ensure company success?

Options:

A.

Review the project objectives with the project sponsor to agree on more realistic and achievable project plans and deliverables


B.

Request more funding from the project sponsor to hire additional skilled resources

and to incorporate additional quality in the project delivery approach and outcome


C.

Conduct periodical reviews of the project plans, objectives, and deliverables to ensure all relevant data are captured to continue making informed project decisions


D.

Create a business case after performing a market review, and then submit it to the sponsor to modify the project deliverable to meet the newly defined objectives


Expert Solution
Questions # 147:

The project manager is having difficulty communicating with one of the team members The team member recently attended a training course and has been training other team members in a new agile technique However sometimes the team member is forceful in pushing ideas even if other team members are uncomfortable

What personality indicators should the project manager consider when determining what communication style to use with this team member?


Expert Solution
Questions # 148:

The team is working on a critical project deliverable and the project manager is concerned about meeting the deadline There have been complaints from some stakeholders about some of the team members' performance The project manager wants to understand the situation and provide feedback to the team as soon as possible

What three actions should the project manager take to address this situation? (Choose three)

Options:

A.

Define team ground rules


B.

Perform a retrospective session


C.

Implement daily team meetings.


D.

Request a manager performance review


E.

Conduct an annual review.


Expert Solution
Questions # 149:

A project manager is managing an innovation project for a big corporation The project manager is planning to use email as the main communication channel, however, the product owner prefers to use another approved communication tool instead of email

What should the project manager do?

Options:

A.

Contact the sponsor to request direction regarding the communication tool to be used by the project team


B.

Update the communications management plan based on the product owner’s

preferences and distribute to the team


C.

Suggest to the team to start using the communication tool suggested by the product owner


D.

Request the product owner to use email because using another tool will increase the workload


Expert Solution
Questions # 150:

Some of the mote experienced members of a project team have complained about the project manager The senior project team members feel that the project manager is micromanaging them and preventing them from completing their work.

What should the project manager do when made aware of these issues?

Options:

A.

Ask for advice on how to be a better mentor to these team members.


B.

Set up a team building event to bring synergy back to the project team.


C.

Adjust the project manager's management style to better fit senior team members.


D.

Meet daily with each senior team member to monitor project status


Expert Solution
Viewing page 3 out of 12 pages