Questions # 551:

During the development of a product, multiple identified risks have now become issues, which is hindering the team's velocity. What should the project manager do in this situation?

Options:

A.

Document the issues and extend the project delivery timeline.


B.

Convene the steering committee and inform them of the impact to the project.


C.

Prioritize the user stories with issues and have the team resolve them


D.

Update the project management plan and risk management plan.


Expert Solution
Questions # 552:

It is late at night on a weekend when a team member calls the project manager on the telephone. The team member Is crying about the pressures of an upcoming deadline.

What should the project manager do?

Options:

A.

Ask the team member to send their concerns in writing.


B.

Empathize with the team member and discuss next steps.


C.

Review the organization's human resources (HR) policy.


D.

Schedule a meeting with the team member for the next work day.


Expert Solution
Questions # 553:

A bank is considering building another branch in one of three neighboring cities. The project manager has been tasked with demonstrating the benefits of building a new branch, renting an existing building, or not expanding at all.

How should the project manager proceed?

Options:

A.

Calculate the payback period (PBP) for building a new branch in each location versus renting an existing building.


B.

Calculate the costs for each option in each location and compare the net present value (NPV) for each.


C.

Perform a Kano analysis on building a new branch versus renting in each of the locations.


D.

Perform a gap analysis on renting in each of the locations.


Expert Solution
Questions # 554:

A project manager Is working on a project using a hybrid approach. The project Is scheduled to be completed in three more sprints. One of the team members notifies the project manager that they are leaving the company which was approved by their functional manager

What should the project manager do first in this situation'?

Options:

A.

Ask the functional manager why a decision was made without consulting them


B.

Use soft skills to influence the team member to slay until the project is completed


C.

Ask the functional manager for an immediate replacement for the team member.


D.

Review the risk management plan and mitigation plan to understand the impact of this issue


Expert Solution
Questions # 555:

A final iteration is underway and a project team is about to complete development Planning tot the product release is about to start. One stakeholder raised a concern about the product not being compatible with a new technology that has been adopted in the market

How should the project manager address this issue?

Options:

A.

Assess the business value impact and review the product roadmap to include any changes


B.

Schedule a retrospective to understand why the new requirement was not included in product backlog previously


C.

Stop the product release and start adding new user stones to the product backlog for any new requirements


D.

Proceed with product delivery as planned and start a new requirement analysis for the next iteration


Expert Solution
Questions # 556:

A new project manager is assigned to a project that will deliver a new and optimized credit system. The project manager is allowed to use a hybrid approach which is new to the organization to manage the project and new tools

In order to deliver the project successfully, what should the project manager focus on as part of the plan?

Options:

A.

Align with the organization's project management office (PMO) to inform and make them aware of the new approach


B.

Explain and communicate the new approach to the project sponsor and key stakeholders


C.

Develop a detailed schedule for the entire project m the planning phase and communicate that to the stakeholders


D.

Communicate with other project managers to see how they manage hybrid projects


Expert Solution
Questions # 557:

A project manager is reviewing the requirements of a large program. Which requirements should the project team prioritize to avoid getting fines?

Options:

A.

Developing new product lines


B.

Complying with new regulations


C.

Establishing company processes


D.

Certifying sustainable products


Expert Solution
Questions # 558:

A project manager is assigned to a project that has a tight schedule. Due to recent market changes the marketing team has identified that a few features that were initially in the scope are no longer required

What should the project manager do?

Options:

A.

Advise the marketing team that at this stage of the project changes to the scope are no longer accepted


B.

Escalate the issue to the project management office (PMO) and make sure they understand the impact on the schedule due to the change


C.

Update the risk register with input from marketing and sales and highlight the benefits of the features m discussion


D.

Review the change request with the project stakeholders and evaluate the impact of the scope reduction


Expert Solution
Questions # 559:

A project manager is leading a project to modemize the information technology of a bank. The project manager needs to determine how the project stakeholders should communicate, and has discussed the various options with the project team.

What should the project manager do to communicate with the stakeholders?

Options:

A.

Provide updates to the project sponsor to review and distribute to each stakeholder.


B.

Use a single communication medium such as video teleconferencing to limit confusion.


C.

Use a variety of communication methods that respect cultural, practical, and personal preferences.


D.

Send frequent updates via email to each stakeholder because this is an information technology project.


Expert Solution
Questions # 560:

A project manager is implementing an enterprise-wide software project The project has a great business impact and is fully supported by senior management However, the project manager is facing difficulties gelling the support of several key departments.

What should the project manager do?

Options:

A.

Ask senior management to communicate with these departments.


B.

Hire a project management consultant to help resolve the issue


C.

Convince senior management to introduce rewards to resisting departments.


D.

Understand the user concerns and revisit the stakeholder engagement plan


Expert Solution
Questions # 561:

An agile project team is tasked with a new project After multiple discussions with me customer it appears that there is a lack of clarity on the requirements which resulted in delays in the architecture and design phase

What should the team do next?

Options:

A.

Start with the end user documentation review with the customer and gather feedback


B.

Start with design of the prototype review with the customer and gather feedback


C.

Start with the product prototype development, review with the customer, and gather feedback


D.

Start with the product architecture review with the customer and gather feedback


Expert Solution
Questions # 562:

The project team is planning a schedule with limited information. The team |s having

issues identifying the detailed tasks and estimating task durations.

Which three techniques should the project manager use? (Choose three)

Options:

A.

Rolling wave planning and an adaptive approach


B.

Relative estimation to determine the task or deliverable sizes


C.

Iterations and reviews to continuously keep adapting the plan


D.

Bottom-up estimating based on a work breakdown structure (WBS)


E.

Gantt chart that includes milestones and deadlines https://www.projectmanager.com/blog/project-management/planning-techniques-for-projects


Expert Solution
Questions # 563:

An agile project is in its early iterations, but the project manager already realizes that

more resources will be needed to achieve the expected time lines. There are no internal

resources. available.

What vendor strategy should the project manager use to maximize project delivery?

Options:

A.

Use compression techniques to break down the scope and assign the scope pieces todifferent vendors with a fixed-price contract.


B.

Use the contingency budget for hiring additional vendor resources to mitigate any projectrisk.


C.

Engage in a time and materials (T&M) contract and hire a local vendor to supportdevelopment.


D.

Establish a solid view of the scope and requirements and engage a vendor with a fixed price contract.


Expert Solution
Questions # 564:

What is the correct way to put an organization on the proper path to changing their mindset to an agile approach?

Options:

A.

Hire employees who specialize in agile approaches so they can better contribute toprojects.


B.

Assign employees to agile projects so they can quickly adjust to the new approach.


C.

Train all employees in agile approaches.


D.

Shift the way the company views, reviews, and assesses employees.


Expert Solution
Questions # 565:

During a project planning phase, the project manager realizes that project performance win be measured based on budget deviation and revenue, but without consideration for the overall project schedule What should the project manager do?

Options:

A.

Review and update the project schedule according to performance


B.

Review the schedule baseline and consider adopting a schedule performance indicator


C.

Develop a lime. cost, and scope tracking method exclusively for this project.


D.

Adopt a formal change management process for the project


Expert Solution
Questions # 566:

A company has undertaken a large transformation project using agile practices. The project sponsor has asked the project manager to promote the new values identified in the intended transformation to the project team

What should the project manager do?

Options:

A.

Add a user story during sprint planning that gives recognition to behaviors that are aligned with the new values


B.

Send a standard email to the team prior to every daily standup containing the new values


C.

Organize a team meeting focusing on the new values associated with the transformation


D.

Give recognition to team members' behaviors that are aligned with the new values during the sprint retrospectives


Expert Solution
Questions # 567:

A company is transitioning their projects to utilize hybrid project management approaches While putting together their project team, the project manager discovers the requirements from the customer are unclear and also realizes that the team members are lacking critical technical stalls needed for project success. However the customer will not accept any changes to the requirements

What should the project manager do to resolve this issue?

Options:

A.

Submit a change request to adapt the objectives of the project to the current situation


B.

Ask the scrum master to refine the user stones to improve the team members' understanding


C.

Find and provide training to the project team members who do not have the required skills


D.

Extend the duration of standup meetings to include skill transference from trained to untrained members


Expert Solution
Questions # 568:

As a result of updated external regulations a project manager has been asked to upgrade the operation system tor a call center The project manager is beginning to meet with and segment the stakeholders involved

How should the project manager categorize the call center staff? Click on the correct section of the power/interest grid.

Question # 568


Expert Solution
Questions # 569:

A project manager for a large software delivery project is in the process of finalizing the project governance, The project manager would like to implement procedures that do not align with several policies required by the organization's project management office (PMO). The project manager

believes that the procedures outlined in the project governance will be necessary for this particular project due to the unique nature of the

technology.

What should the project manager do?

Options:

A.

Engage stakeholders to modify policies outlined by the PMO.


B.

Move forward with the project governance and inform the PMO.


C.

Discuss the proposed changes with the PMO.


D.

Disregard the initial procedures and follow the policies outlined by the PMO,


Expert Solution
Questions # 570:

A project manager for a technology project is informed by the cybersecurity team that

there are changes in the government's cybersecurity requirements. The project manager calls a team meeting to discuss the requirements, and the team learns that the design changes can be made at no additional cost.

What should the project manager direct the team to do?

Options:

A.

Update the scope management plan to track the new government requirements.


B.

Accept the cybersecurity team’s request as the security of the company is at risk ofbeing noncompliant.


C.

Ask the project sponsor to increase funds in the contingency reserve as a risk mitigation.


D.

Request a change through the change control process to manage the new cybersecurityrequirements.


Expert Solution
Questions # 571:

A company is transitioning its projects from a predictive to an iterative approach. The protect team is complaining because they are unsure of what needs to be done due to all of the changes requested by the product owner for features already developed since the beginning of the project.

How should the project manager handle this situation?

Options:

A.

Ask the product owner to create a new entry in the risk management plan regarding likelihood and imped


B.

Review the backlogs from similar projects and understand how change requests were implemented


C.

Ask the product owner to follow the change request process to formalize new requirements


D.

Make sure that the product and sprint backlogs have the required level of documentation and both are visible to the team


Expert Solution
Questions # 572:

During a kick-off meeting at the start of project execution, the vendor presents a

migration plan to client stakeholders. The director of the business unit that owns the solution being migrated demands the ability to make the final go/no-go decision about whether the systems go live.

What should the project manager do?

Options:

A.

Schedule a meeting with the director to provide proof of expertise so the clientstakeholders will trust the project team's decision.


B.

Schedule a meeting with the project sponsor to determine if it is appropriate to acceptthe director's request to provide a decision.


C.

Confirm with the director that the client stakeholders will be made accountable for thedecision in the responsibility assignment matrix (RAM).


D.

Ask the client to initiate a change request to make the director accountable for thedecision.


Expert Solution
Questions # 573:

In the middle of an iteration, the product owner tells the agile team that the

government has updated legal requirements. This will result in some changes in the product

definition.

How should the project manager handle this situation?

Options:

A.

Review the iteration backlog because the product definition has changed and needs tobe reassessed before continuing the project.


B.

Continue work and ask the product owner to assess the changes and add/remove thestories as needed in the backlog.


C.

Ask a business analyst to assess the changes and then add/remove the stories in thebacklog and prioritize them by business value.


D.

Ask the product owner to add new changes to the bottom of the backlog in order tohandle the modifications as a change request.


Expert Solution
Questions # 574:

A project manager has considered a detailed and expensive training plan for a new technology for all team members. The training is needed several months into the execution phase of a project Surprisingly. many problems still appear that are related to the team members' lack of competence and the training costs are now negatively impacting the budget baseline

What should the project manager do next?

Options:

A.

Select resources who are more experienced with the new technology


B.

Perform a root-cause analysis to measure how the new training will address the issue


C.

Include in the risk register a risk of unskilled resources for the new technology


D.

Elaborate and socialize the team charter as per the resource management plan


Expert Solution
Questions # 575:

The product backlog has been completed and prioritized. and the first sprint has begun A team member advised that during the daily standup there is a delay in having an external vendor contract signed.

What is the project manager's priority in this situation?

Options:

A.

Request that the team member gel the contract signed as soon as possible


B.

Determine a mitigation strategy to move the project forward


C.

Take over contract negotiations for the team member to speed up the process


D.

Assist with the removal of impediments and blockers so that the project can continue


Expert Solution
Questions # 576:

A project is scheduled to end in 2 weeks. The team is expected to continue working long hours and is showing signs of weariness and fatigue What should the project manager do to encourage the team?

Options:

A.

Schedule training courses to enhance team performance


B.

Add new team members to help the project finalization


C.

Initiate rewards and incentives according to assessment results


D.

Schedule working lunch meetings until the project is complete


Expert Solution
Questions # 577:

A project team has finished participating in an iterative product increment planning session. After the planning session, the team returns with a list of features to deliver.

How should the project manager ensure the product increments deliver the anticipated requirements?

Options:

A.

Appoint a dedicated product manager for the duration of the release


B.

Have the customer approve the product increment features.


C.

Ensure every user story has acceptance criteria.


D.

Track business outcomes for planned user stories.


Expert Solution
Questions # 578:

A project manager notices that one of the marketing executives in the firm always appears stressed. The project manager observes that the executive's performance is gradually declining and is affecting the project deliverables.

What should the project manager do?

Options:

A.

Assign the marketing executive's tasks to another project team member


B.

Review the executive's declining performance with human resources (HR)


C.

Show empathy and praise the marketing executive's strengths


D.

Make the marketing executive accountable for their work and output


Expert Solution
Questions # 579:

A project manager /s planning a project and identifies that legislation requirements for specific project tasks will be changing. This will occur half way through the project execution

phase and will affect a few key workers’ licenses, which will become noncompliant.

What should the project manager do?

Options:

A.

Start scheduling the training for key workers now to ensure compliance.


B.

Maintain the current key workers since the project has already started.


C.

Update the project charter to ensure the new legislation is addressed,


D.

Start a recruitment drive for new workers with the licenses required.


Expert Solution
Questions # 580:

Early prototypes developed in a project show an unacceptably high detect rate. The quality management plan calls for a cause-and-effect analysis to address quality problems as they arise.

What is the protect manager's first step in addressing the problem?

Options:

A.

Communicate the issue to the change control board (CCB) and relevant stakeholders identified in the stakeholder engagement plan


B.

Create a problem-solving team from quality assurance subject matter experts (SMEs) experienced in this type of analysis


C.

Form a brainstorming team from project team members selected for their relevant technical analytical and management knowledge


D.

Form a brainstorming team with stakeholders from all of the functional departments involved in the project


Expert Solution
Questions # 581:

In a geographically distributed project team, the project team members continue to email status reports and update schedules after their weekly meeting discussions. However, the team is having difficulty tracking the changes and progress made.

What should the project manager do?

Options:

A.

Maintain a central repository of artifacts with a version control system.


B.

Maintain separate document control via regions to avoid discrepancies.


C.

Develop a document management software for version control.


D.

Facilitate training on version control and project artifacts,


Expert Solution
Questions # 582:

At the end of a third planning meeting, the client and a functional manager requested additional meetings to add more features to the product.

What should the project manager do to start building the product faster?

Options:

A.

Allow the sponsor to determine how long the planning phase should last.


B.

Allow the client ta determine how long the planning phase should last.


C.

Ask the functional manager to work with the team to finalize planning and begin building the product.


D.

Explain that more features can be planned in upcoming Iterations and begin building the product.


Expert Solution
Questions # 583:

A new project manager is assigned to an ongoing agile innovation project that started 2 weeks ago. After reviewing the project, the new project manager discovered that the previous project manager was planning to use a predictive approach. The previous project manager planned to present the first major deliverable to the client when the project was completely finished in 8 months.

What should the new project manager do?

Options:

A.

Meet with the team to review the backlog and create small iterations that can deliver incremental value to the client,


B.

Continue working with the predictive approach to deliver the value at the end of the project.


C.

Use a hybrid approach in which agile practices are used but the value is provided to the client at the end of the project.


D.

Submit a change request to the project board to adjust the delivery date to 2 months earlier than planned.


Expert Solution
Questions # 584:

A new project team has formed and the project manager notices that some of the team members do not feel comfortable being part of the project team As a result members of the team are working individually and not as a team

What should the project manager do to resolve this?

Options:

A.

Facilitate a team-building meeting to help this issue


B.

Allow the team members to remain in their former individual roles


C.

Directly guide the team members on how to perform their tasks


D.

Wait until some iterations are completed to intervene


Expert Solution
Questions # 585:

A project team member is providing updates to assigned work and reports a task as complete, As the project progresses, it is observed that the task is not fully complete.

What should the project manager do moving forward?

Options:

A.

Provide clear expectations around task requirements.


B.

Review the task list with the team on a regular basis,


C.

Provide templates for the product owner to use in the future.


D.

Review the task with the sponsor to see if they are satisfied.


Expert Solution
Questions # 586:

A new solution is being deployed in countries A B and C. This solution will allow the countries to propose new services to their customers Country A has asked for a change in the solution m order to comply with its own customer market

What should the project manager in charge of the deployment in country A do?

Options:

A.

Accept the change request from country A and reschedule the deployment project for country A.


B.

Take the request into account and ask the sponsor to inform countries B and C about the change


C.

Ask country A to submit a change request that will be analyzed along with countries B and C


D.

Refuse country As request as there is no time for the change as deployment has already begun


Expert Solution
Questions # 587:

A key challenge that a project manager is facing is the lack of discipline by various team members and their inability to harness energy to achieve the project objectives. What should the project manager do to overcome this challenge?

Options:

A.

Meet with each team member separately and apply an appropriate approach with each one.


B.

Approach the project sponsor and request help in discussing the project deliverables with team members.


C.

Explain to the team that the project manager is ultimately responsible for the delivery.


D.

Assign multiple managers to the various teams and delegate all of the tasks to them.


Expert Solution
Questions # 588:

A predictive project team come across a scenario where they need to use some agile tools and methods. However, they did not feel this was appropriate since their organizational project management processes did not mention this.

What should the project manager do in this scenario?

Options:

A.

Ensure the project team follows the organizational project management processes.


B.

Create a change request to include the agile methods and proceed to implementation,


C.

Work with the team to determine appropriate project methods and practices and implement them.


D.

Prepare a summary and escalate this issue to the project's change control board (CCB),


Expert Solution
Questions # 589:

One phase of a project took much longer than initially anticipated The key stakeholders expressed their concern regarding a potential project delay. What should the project manager do?

Options:

A.

Expedite the next phase to reduce slippage


B.

Add more float to the overall project schedule


C.

Request additional contingency from the sponsor.


D.

Organize a root cause analysis (RCA) workshop.


Expert Solution
Questions # 590:

A project manager is consolidating information tor all the workstreams within a data center and IT service transition project To ensure the project delivers value quickly the project manager will assess a large number of consolidated project schedules

Which two actions should the project manager take with regard to schedule analysis? (Choose two)

Options:

A.

Review with subject matter experts (SMEs) to ensure they have contributed to the schedule development


B.

Evaluate the master schedule and perform fast tracking and task crashing


C.

Look (or gaps in the different schedules to determine which major risks might evolve over time


D.

Review the project schedules to ensure that all tasks end with milestones


E.

Evaluate the schedules for interdependencies to establish the critical path


Expert Solution
Questions # 591:

A project manager is working toward a deadline to prepare a client report. The project manager prepared a meeting agenda but not a single meeting has gone according to plan True, meetings always end in arguments and no action items come out of it. The project manager is very frustrated and seeks help from the project sponsor

What should the project manager have created to prevent this situation1?

Options:

A.

Resource breakdown structure


B.

Work breakdown structure (WBS)


C.

Team charter


D.

Project charter


Expert Solution
Questions # 592:

A project manager for a construction site realizes the importance of stakeholder

relations, especially with the local community. The project manager and the project team strive to build effective relationships with these key stakeholders in order to prevent obstacles in the future.

What should the project manager do to customize the stakeholder engagement plan?

Options:

A.

Analyze stakeholder diversity in the community.


B.

Assess the need to collaborate with the community


C.

Analyze the need to negotiate with the community.


D.

Assess the information requirements of the community


Expert Solution
Questions # 593:

One of the risks identified during project planning activities is related to a component from a preferred vendor. The component utilizes new technology, and there is a possibility of incompatibility with other parts of the system that are being developed.

What should the project manager do?

Options:

A.

Create a risk probability matrix to address the incompatibility.


B.

identify an alternative component in case of incompatibility.


C.

Use the contingency fund to redesign the interface if it is incompatible,


D.

Require the vendor to redesign the incompatible component to fit the system.


Expert Solution
Questions # 594:

An agile team recently started working on a project for a financial institution. The

project sponsor is concerned that an agile approach will not provide enough support for the

organization's compliance standards.

In order to mitigate this risk and avoid problems, what should the project manager do?

Options:

A.

Propose using a compliance review board that will be responsible for approving allproduct features prior to their release to the public.


B.

Liaison with the compliance group, making them responsible for understanding therequirements and keeping them prioritized in the backlog.


C.

Meet with the compliance team and make sure that their requirements are covered in thedefinition of done (DoD) for each story.


D.

Ensure that the peer review process also covers compliance requirements, creating asecond layer of security for the project.


Expert Solution
Questions # 595:

A technical lead has complained to the project manager about a team member's performance. The team member has repeatedly missed tasks that have put sprint commitments at, What should the project manager do?

Options:

A.

Remove the learn member from the team and hue a more skilled one


B.

Ask the technical lead to provide more training to the team member


C.

Ask the technical lead to discuss performance directly with the team member


D.

Meet with the team member to understand the situation and provide feedback.


Expert Solution
Questions # 596:

A company is transitioning from a predictive to an agile approach. During the last two sprint reviews, the product owner complained about the development team, indicating that the increments do not meet the acceptance criteria defined in the user stories. The development team complained about the product owner, who is defining sprint backlog items, because the backlog items cannot be delivered during the 2-week sprints agreed to at the beginning of the project.

How should the project manager resolve this situation in their new role as servant leader?

Options:

A.

Review the organizational process assets (OPAs) to find similar situations and review the resolution actions taken,


B.

Request that the team use the next sprint to complete all technical debt remaining from the previous sprints.


C.

Extend the sprints to 3 weeks to allow the work requested by the product owner to be completed.


D.

Encourage the whole team to be empowered and accountable for the decisions made according to their roles,


Expert Solution
Questions # 597:

An agile team completes a deliverable that is to be certified by another expert team The second team does not take the deliverable for many months What should the servant leader do?

Options:

A.

Review the process and remove the impediment


B.

Escalate this to the project director for a resolution


C.

Remove the certification need from the project scope


D.

Escalate this to the agile lead of the second team


Expert Solution
Questions # 598:

A project manager has been assigned to lead a major project in a government organization. There are no policies and procedures for project management since there is no project management office (PMO) The managers involved are unaware of their responsibilities for the project

What should the project manager do?

Options:

A.

Start planning the project and then request that a PMO be implemented in the organization


B.

Request that the implementation of a PMO be executed in parallel with the project


C.

Provide project management training to only the internal team involved m the project


D.

Provide project management training to the stakeholders and explain their responsibilities


Expert Solution
Questions # 599:

A new product is designed for a certain market. This product needs to adhere to the health and safety regulations for that region. What should the project manager do to ensure that the product complies with the regulations?

Options:

A.

Inform the design team to ensure compliance during the product design phase


B.

Inform the quality team that they need to ensure that the product is in compliance


C.

Ensure that compliance is explicitly mentioned in the relevant requirements


D.

Meet with the team and remind them of the compliance requirements


Expert Solution
Questions # 600:

A self-organizing team brings an internal problem to the project manager. What should the project manager do as a servant leader?

Options:

A.

Provide the team with a solution that solves the problem.


B.

Coach the team to solve the problem independently,


C.

Discuss the issue with the management team and provide a solution,


D.

Speak with the team lead about the issue and provide a solution,