Summer Certification Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: force70

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-Green-Associate Questions and answers with CertsForce

Viewing page 3 out of 13 pages
Viewing questions 21-30 out of questions
Questions # 21:

What is the term for collecting, reprocessing, marketing and using materials that are diverted or recovered from the solid waste stream?

Options:

A.

Recycling


B.

Chain -of-custody


C.

Salvaged materials


D.

Building material reuse


Expert Solution
Questions # 22:

A project team has three principal participants with LEED AP credentials. One is an energy modeler, one is a civil engineer and the third one is a general contractor. Under which category can their credentials contribute a point?

Options:

A.

Innovation


B.

Commissioning (Cx)


C.

Sustainable Sites


D.

Energy and Atmosphere


Expert Solution
Questions # 23:

Which of the following is a component of the Promote Sustainable and Regenerative Material Resource Cycles impact category?

Options:

A.

Move to Cyclical, Non-Depleting Material Cycles


B.

Protect Human Health Globally and Across the Built Environment Life Cycle


C.

Protection and Restoration of Water Regimes and Natural Hydrological Cycles


D.

Greenhouse Gas (GHG) Emissions Reduction from the Embodied Energy of Materials


Expert Solution
Questions # 24:

Which of the following LEED categories rewards projects for locating a building near existing infrastructure to encourage active travel and reduce carbon emissions?

Options:

A.

Energy and Atmosphere (EA)


B.

Sustainable Sites (SS)


C.

Location and Transportation (LT)


D.

Indoor Environmental Quality (EQ)


Expert Solution
Questions # 25:

By specifying the installation of occupancy sensors for the building ' s lighting system, what pair of LEED credit categories would be affected?

Options:

A.

Innovation and Water Efficiency


B.

Integrative Process and Sustainable Sites


C.

Location and Transportation and Materials and Resources


D.

Indoor Environmental Quality and Energy and Atmosphere


Expert Solution
Questions # 26:

A project team is preparing to submit documentation for LEED certification through the official online platform. They must include specific project information and sustainability strategies aligned with the credits pursued. Which action should the project administrator take to ensure accurate and organized submission of project documentation in the online platform?

Options:

A.

Utilize automated software to streamline the documentation process


B.

Maintain a checklist for tracking the status of each credit’s documentation


C.

Assign roles to specific team members for documentation upload and quality control


D.

Submit only the credits that are easiest to document


Expert Solution
Questions # 27:

Which of the following credit categories does not have a prerequisite?

Options:

A.

Water Efficiency


B.

Materials and Resources


C.

Location and Transportation


D.

Indoor Environmental Quality


Expert Solution
Questions # 28:

Which of the following contribute to the triple bottom line?

Options:

A.

Global security


B.

Social responsibility


C.

Project balance sheet


D.

Green metrics and verification


Expert Solution
Questions # 29:

What Indoor Environmental Quality prerequisite or credit is specific to LEED for Schools?

Options:

A.

Thermal Comfort


B.

Quality Views


C.

Daylight


D.

Minimum Acoustic Performance


Expert Solution
Questions # 30:

The intent of the location valuation factor is to incentivize the purchase of products that

Options:

A.

reduce transportation emissions


B.

support the local economy and workers


C.

emit no Volatile Organic Compounds (VOCs)


D.

comply With responsible extraction regulations


Expert Solution
Viewing page 3 out of 13 pages
Viewing questions 21-30 out of questions