Questions # 81:

Use of which of the following can help reduce the heat gain and peak air temperatures?

Options:

A.

A drip irrigation system


B.

Pervious paving materials


C.

Low albedo paving materials


D.

High reflectance roofing materials


Expert Solution
Questions # 82:

Which of the following is a strategy for reducing indoor water use?

Options:

A.

Install submeters


B.

use graywater for hand washing


C.

Reuse Salvaged plumbing fixtures


D.

Install a time-sensitive drip irrigation system


Expert Solution
Questions # 83:

Integrated Project Planning and Design is a prerequisite for which type of buildings?

Options:

A.

Retail


B.

Schools


C.

Healthcare


D.

Data Centers


Expert Solution
Questions # 84:

Which of the following best helps a project team determine access to quality transit? raj Calculator

Options:

A.

Access to parking


B.

The surrounding density


C.

The quantity of functional entries in a building


D.

The availability and frequency of public transportation


Expert Solution
Questions # 85:

An owner of newly acquired land wants to design a building that uses materials that have minimal impact on the environment. Which of the following strategies would help achieve this goal?

Options:

A.

Life-cycle assessment


B.

Life-cycle costingC Simple payback


C.

Environmental assessment


Expert Solution
Questions # 86:

Light trespass beyond the project boundary can be prevented by the use of

Options:

A.

flood light fixtures


B.

up-lighting fixtures


C.

shielded light fixtures


D.

increasing the number of light fixtures


Expert Solution
Questions # 87:

Which industry benchmarking tool is used for measuring ongoing energy performance?

Options:

A.

Bright Power's EnergyScoreCard


B.

U.S. Department of Energy's EnerCop


C.

EPA's ENERGY STAR Portfolio Manager


D.

U.S. Department of Energy's EnergyIQ


Expert Solution
Questions # 88:

Which of the following plans is implemented after occupancy?

Options:

A.

Value Engineering


B.

Stormwater Pollution Prevention


C.

Green Cleaning


D.

Fundamental Commissioning (Cx)


Expert Solution
Questions # 89:

In a large site that has a short, intense rainy season and a long, dry season, what component of a collected rainwater irrigation system is most likely to make it cost prohibitive over a conventional system?

Options:

A.

Irrigation piping systems


B.

Irrigation control systems


C.

Rainwater storage cisterns


D.

Landscaping plant selection


Expert Solution
Questions # 90:

The Commissioning (Cx) Process has been structured to coincide with the phases of a generic project in which of the following sequences of phases?

Options:

A.

OPR, Design, Construction, Operations and Maintenance


B.

Basis of Design (BOD), OPR, Cx, Construction


C.

Pre-Design, Design, Construction, Occupancy and Operations


D.

Basic Design, Construction, Cx, Owner’s Project Requirements (OPR)


Expert Solution