Questions # 41:

An owner is looking to update the interior materials of the office while promoting a healthier indoor work environment using LEED strategies. During the materials specification, which of the following strategies can the owner take in order to achieve this goal?

Options:

A.

Specify salvaged materials


B.

Specify low-cost materials


C.

Specify low-emitting materials


D.

Specify high solar reflectance materials


Expert Solution
Questions # 42:

What green building objective does utilizing high efficiency water fixtures achieve?

Options:

A.

Preventing stormwater pollution


B.

Conserving the Earth's potable water supply


C.

Providing adequate watering for indigenous plants


D.

Utilizing more unused graywater for flushing water closets


Expert Solution
Questions # 43:

An office building is located in an area without public transit access. Which of the following strategies should the office use to promote alternative transportation?

Options:

A.

Offer preferred parking for single-use vehicles


B.

Develop a carpooling program for building occupants


C.

Provide additional parking


D.

Require the local transit authority to add a new route to the site


Expert Solution
Questions # 44:

Which of the following project types and scopes are addressed by LEED rating systems?

Options:

A.

LEED Operations & Maintenance: Schools


B.

LEED Interior Design and Construction: Data Centers


C.

LEED Building Design and Construction: Existing Buildings


D.

LEED Neighborhood Development: Warehouses and Distribution


Expert Solution
Questions # 45:

Which of the following is a minimum program requirement for LEED@ for New Construction and Major Renovations projects?

Options:

A.

Be a permanent building or space on existing land


B.

Commit to sharing data for water usage only


C.

Comply with maximum floor area requirements


D.

Comply with maximum ventilation rate requirements


Expert Solution
Questions # 46:

What is reclaimed water?

Options:

A.

It is potable water from a well within the project boundary, and owned by the project owner


B.

It is wastewater that may have undergone treatment from a nearby plant and is intended for non-potable use


C.

It is a quota of potable water reclaimed to the utility company should the project water consumption fall more than 20% lower than the Energy Policy Act of 1992 (EPAct of 1992) baseline


D.

It is graywater treated within the project premises and sold back to the utility company


Expert Solution
Questions # 47:

What is the best way to prevent a building's indoor pollutant(s)?

Options:

A.

Test for radon


B.

Monitor carbon dioxide


C.

Eliminate or control pollutants at the source


D.

Remove any pollutants that enter the building


Expert Solution
Questions # 48:

Which of the following principles is a part of the integrated process?

Options:

A.

Cradle-to-cradle


B.

Systems thinking


C.

Project scheduling


D.

Building information modeling


Expert Solution
Questions # 49:

What do the credits in the Materials and Resources category focus on?

Options:

A.

Reducing the quantity of materials used on a project


B.

Selecting materials that are more energy efficient than traditional building materials


C.

Minimizing the embodied impacts associated With the entire life-cycle of building materials


D.

Helping project teams select materials that have the most environmental benefits at the least cost


Expert Solution
Questions # 50:

Utilizing recycled materials achieves the green building objective of

Options:

A.

minimizing the need for landfills


B.

promoting the use of virgin materials and resources


C.

encouraging environmentally responsible forest management


D.

increasing demand for products extracted and manufactured within the region