Questions # 11:

Which type of site Is appropriate for development of LEED projects?

Options:

A.

Floodplain


B.

Greenfield


C.

Brownfield


D.

Undeveloped


Expert Solution
Questions # 12:

A wood product that is certified by the Forest Stewardship Council (FSC) is guaranteed to be

Options:

A.

grown in a tropical forest


B.

harvested from a well-managed source


C.

packaged with environmentally friendly materials


D.

purchased from a LEED AP


Expert Solution
Questions # 13:

The goal of regional priority credits is to incentivize project teams to

Options:

A.

use a LEED AP on the design team


B.

increase environmental education and advocacy


C.

achieve credits that address geographical specific environmental issues


D.

prioritize the needs of certain areas in the country that have more environmental impact needs than others


Expert Solution
Questions # 14:

Which is a Demand Response strategy?

Options:

A.

Community Planning


B.

The Commissioning process


C.

Tiered demand electricity pricing


D.

Energy load analysis


Expert Solution
Questions # 15:

LEED for Neighborhood Development encourages

Options:

A.

development on federally regulated wetlands


B.

employment of Fair Trade Certified day laborers


C.

development within and near existing communities or public transportation infrastructure


D.

development in rural areas within 1 mi. (1.60 km) of public transportation, and 3/4 mi. (1.20 km) from a school, medical facility, park and shopping center


Expert Solution
Questions # 16:

At which stage should the coordination of building and site systems be addressed to maximize the impact of integrative process?

Options:

A.

Predesign


B.

Detailed Design


C.

Post Occupancy


D.

Schematic Design


Expert Solution
Questions # 17:

Which of the following stakeholders are involved in the feedback mechanism?

Options:

A.

Occupants


B.

Civil Engineer


C.

Landscape Architect


D.

Building Energy Modeler


Expert Solution
Questions # 18:

The Commissioning (Cx) Process has been structured to coincide with the phases of a generic project in which of the following sequences of phases?

Options:

A.

OPR, Design, Construction, Operations and Maintenance


B.

Basis of Design (BOD), OPR, Cx, Construction


C.

Pre-Design, Design, Construction, Occupancy and Operations


D.

Basic Design, Construction, Cx, Owner’s Project Requirements (OPR)


Expert Solution
Questions # 19:

The project team for a new office building would like to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which strategy contributes to achieving this goal?

Options:

A.

Providing an on-site location for all waste to be sorted


B.

Purchasing Renewable Energy Certificates (RECs)


C.

Providing an off-site location for all waste and construction debris


D.

Providing a centralized location in the building for recycling office products


Expert Solution
Questions # 20:

In addition to the temperature and humidity, what is another factor to consider when implementing thermal comfort strategies?

Options:

A.

Daylight


B.

Acoustics


C.

Air movement


D.

Green cleaning


Expert Solution