Questions # 1:

A firm has been hired to renovate an existing office building and wants to increase the number of points the project receives for Location and Transportation credits. What strategy might the firm recommend?

Options:

A.

Shade the large open parking area with a solar-paneled canopy


B.

Include subsidies for carpools


C.

Replace traditional paving on the parking lot with pervious surfacing


D.

Reduce the building's footprint on the site


Expert Solution
Questions # 2:

Which of the following strategies prioritizes cost-effectiveness when designing a LEED project?

Options:

A.

Onsite renewable systems


B.

Enhanced Commissioning (Cx)


C.

Measuring and verifying systems performance for one year


D.

Applying an integrative design process


Expert Solution
Questions # 3:

The LEED Pilot credit library plays an important role in the continuous evolution of LEED by

Options:

A.

developing new credits for U.S. projects only


B.

achieving the next threshold for exemplary performance


C.

limiting the number of times that a credit category appears in the rating system


D.

providing U.S. Green Building Council (USGBC) with feedback on achievability of proposed credits


Expert Solution
Questions # 4:

Which of the following methods of documentation is used to demonstrate that basic community resources exist within a specified radius of a project?

Options:

A.

Site map showing locations of services


B.

Zoning ordinances for the market area


C.

Color photographs of services


D.

Copies of building permits for services


Expert Solution
Questions # 5:

Which of the following is the reason Regional Priority credits are awarded?

Options:

A.

To help meet economic goals


B.

To encourage exemplary performance


C.

To address local environmental issues


D.

To promote innovation in building design


Expert Solution
Questions # 6:

Which of the following demonstrates life-cycle approach to development or design?

Options:

A.

Purchasing and demolishing a 100-year-old apartment building to build a new. energy-efficient building


B.

Renovating an existing building using recycled and salvaged building materials


C.

Locating a new building in a dense district with a diversity of uses and plentiful transit routes


D.

Designing a building envelope with the most advanced technology to maximize insulation values, regardless of what materials are used


Expert Solution
Questions # 7:

Lighting controls are typically installed in buildings in order to

Options:

A.

provide a uniform light level across every space in a building


B.

prevent building occupants from making changes to the light levels


C.

improve occupant comfort and save energy throughout the building


D.

filter glare produced by overhead fixtures and prevent ultraviolet radiation from reaching building occupants


Expert Solution
Questions # 8:

Integrated Project Planning and Design is a prerequisite for which type of buildings?

Options:

A.

Retail


B.

Schools


C.

Healthcare


D.

Data Centers


Expert Solution
Questions # 9:

Which of the following factors contributes to improved general health of building occupants and construction workers?

Options:

A.

High VOC building materials


B.

Post-occupancy flush outs


C.

Application of construction management practices


D.

Low ventilation rates


Expert Solution
Questions # 10:

Which of the following third-party verification strategy contributes to environmentally preferable products?

Options:

A.

ASHRAE 90.1


B.

California's Title 24


C.

Green Buying Council


D.

Forest Stewardship Council