An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants' comfort?
The maximum number of points that can be achieved under the Energy and Atmosphere category for Building Design and Construction: New Construction and Major Renovation is:
Which of the following does a facility operator need in order to optimize water consumption?
The range of points required to maintain Gold level of LEED certification is
To attain the Integrative Process Credit, a project team must identify
Which of the following strategies encourages a building's users to use alternative transportation?
A new project is being built adjacent to a park with a 1/8 mi. (0.20 km) trail leading to an urban business district, which includes several retail shops and restaurants. This project qualifies for Location and Transportation Credits by
LEED certification steps generally proceed in which of the following order?
The general contractor for a project located in a dense urban area attempts to gain a credit in Materials and Resources. Which of the following is considered a local material?
Which strategy for roof coverage best addresses both heat island effect and rainwater runoff from the roof only?