A building manager is comparing the operating cost of the existing boiler to the purchase and operation of a new and more efficient boiler. The building manager discovers that although the upfront cost is significant, purchasing the new boiler would drastically decrease the cost of running and operating the system. This exercise is called
The amount of landfill-destined waste generated during project construction can be reduced by requiring the general contractor to
Which strategy promotes sustainable purchasing during construction?
The LEED Pilot credit library plays an important role in the continuous evolution of LEED by
Which of the fallowing projects is eligible for LEED for Building Operations and Maintenance; Existing Buildings?
Which of the following contribute to the triple bottom line?
Which of the following has the highest energy consumption in a typical U.S. office building?
Which of the following Is a source of green power?
Which of the following team members should participate in the initial evaluation to determine which level of LEED certification to target?
Which of the following approaches refers to the identification and quantification of environmental effects throughout the life of the materials andproducts used in a project as well as the project itself?