Questions # 61:

Which of the following organizations ' standards are referenced by the LEED rating systems?

Options:

A.

American Institute of Architects (AIA)


B.

Meeting Professionals International (MPI)


C.

National Fire Protection Association (NFPA)


D.

International Organization for Standardization (ISO)


Expert Solution
Questions # 62:

Which of the following scenarios would potentially help a project earn the most LEED points?

Options:

A.

Renovate an abandoned shopping mall in a low-density area outside the city


B.

Build an office and apartment building near an interstate highway and an existing shopping mall


C.

Renovate a large building in a diverse, walkable business district and central transit connectivity


D.

Build a low-density project on a greenfield site outside the city in order to mitigate environmental impact


Expert Solution
Questions # 63:

Which Is a component of a construction waste management plan?

Options:

A.

List of materials to be diverted from disposal


B.

Projected cost savings from diverting waste


C.

Quantity of waste generated from excavated soil


D.

Distance of the recycling facility from the project site


Expert Solution
Questions # 64:

The general contractor for a project located in a dense urban area attempts to gain a credit in Materials and Resources. Which of the following is considered a local material?

Options:

A.

Quarry tile that is extracted 370 mi (595 km) away and manufactured in a city 1.600 mi (2 575 km) away


B.

Stone that is harvested and processed 80 mi (128.7 km) from the project site and purchased 75 mi. (121 km) away


C.

Vinyl flooring manufactured 500 mi (805 km) away but is sold at a warehouse 2 mi (3.2 km) from the project site


D.

Bamboo flooring that is harvested 2.350 mi. (3 782 km) away and manufactured 200 mi. (322 km) away from the project site


Expert Solution
Questions # 65:

Which of the following is a strategy for reducing indoor water use?

Options:

A.

Install submeters


B.

use graywater for hand washing


C.

Reuse Salvaged plumbing fixtures


D.

Install a time-sensitive drip irrigation system


Expert Solution
Questions # 66:

Which of the following strategies should be followed to avoid using materials with added formaldehyde or harmful chemicals in commercial buildings?

Options:

A.

Selection of low-emitting materials


B.

Use of salvaged materials


C.

Selection of materials with low carbon emissions


D.

Use of materials with the lowest first cost


Expert Solution
Questions # 67:

A new community center is being designed to meet LEED standards for optimal resource efficiency. Which strategy will help the project team achieve LEED certification by optimizing energy efficiency and promoting sustainable operations?

Options:

A.

Installing solar panels and a geothermal heating system


B.

Applying reflective coatings to external walls and surfaces


C.

Utilizing centralized HVAC for consistent temperature


D.

Increasing exterior lighting power for safety


Expert Solution
Questions # 68:

A salvaged wood door from another site qualifies under what Materials and Resources sustainable criteria?

Options:

A.

Certified wood


B.

Materials reuse


C.

Bio-based materials


D.

Waste diversion


Expert Solution
Questions # 69:

LEED encourages compact communities because they provide

Options:

A.

better internet access for the region


B.

more surface area available for parking


C.

shared culture and lifestyle in a city or district


D.

reduction in travel associated with reaching services


Expert Solution
Questions # 70:

When should the Commissioning Authority (CxA) be brought onto the project team?

Options:

A.

At the end of Design Development (DD)


B.

Early in the Schematic Design (SD) phase


C.

Once Construction Administration (CA) begins


D.

Early in the Post-Occupancy Evaluation (POE)


Expert Solution