Questions # 91:

Innovation credits for exemplary performance can be awarded for

Options:

A.

achieving one pilot credit


B.

achieving double the credit requirements


C.

demonstrating significant environmental benefits


D.

demonstrating a qualitative improvement in environmental performance


Expert Solution
Questions # 92:

When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be

Options:

A.

included in the calculation


B.

excluded from the calculation


C.

excluded if the total volume is less than 25% of the building being reused


D.

excluded if the total volume is more than 25% of the building being reused


Expert Solution
Questions # 93:

Which strategy should be employed to improve daylighting when designing a new building?

Options:

A.

Increase the building depth


B.

Increase the number of skylights


C.

Increase the height of interior partitions


D.

Decrease the number of exterior light shelves


Expert Solution
Questions # 94:

Massing and orientation in Integrative Process Credit. Integrative Process evaluates how rotating the building 90 degrees affects

Options:

A.

energy loads


B.

lighting levels


C.

ventilation methods


D.

thermal comfort ranges


Expert Solution
Questions # 95:

Which of the following actions should be taken to ensure that project team members understand and prioritize the selection of materials compliant with the Materials and Resources Credit: Building Product Disclosure and Optimization?

Options:

A.

Select locally sourced and manufactured materials


B.

Procure materials directly from raw material suppliers


C.

Include all building materials in a whole-building life-cycle analysis


D.

Include the material requirements in the project specifications


Expert Solution
Questions # 96:

Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?

Options:

A.

Installing bioretention area


B.

Installing on-site renewable power generation facility


C.

Substituting impervious surface area with high-albedo paving materials


D.

Increase artificial turf on the roof


Expert Solution
Questions # 97:

The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

Options:

A.

At the main entrance, 10 ft. (3 m) from the door


B.

At the main entrance, 25 ft. (7.5 m) from the door


C.

At the main entrance and the two service entrances, 10 ft. (3 m) from the doors


D.

At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors


Expert Solution
Questions # 98:

When the project occupancy is not known, which method is recommended?

Options:

A.

Default occupant density from ASHRAE 62.1-2010, Table 6-1


B.

Default occupant density from ASHRAE 90.1-2010, Table G3.1.1A


C.

Weekly average taken into account all the occupants in a typical 24-hour day of operation


D.

Occupancy measured for eight hours, between 8 a.m. and 5 p.m., for all occupancy patterns


Expert Solution
Questions # 99:

Which of the following variables must be included in the calculations for Indoor Environmental Quality Credit, Quality Views?

Options:

A.

Ceiling heights


B.

Building furniture


C.

Movable partitions


D.

Permanent interior obstructions


Expert Solution
Questions # 100:

Smoking is prohibited inside LEED-certified buildings in order to eliminate the health risks associated with environmental tobacco smoke. Which building type is exempt from this requirement?

Options:

A.

Office projects


B.

Healthcare projects


C.

Warehouse projects


D.

Residential projects


Expert Solution