Questions # 11:

The Solar Reflectance Index (SRI) includes the measure of a material's

Options:

A.

color (shade of gray)


B.

ability to reflect solar radiation


C.

ability to absorb solar radiation


D.

ability to reflect thermal radiation


Expert Solution
Questions # 12:

Which of the following assessments is conducted prior to the completion of the schematic design and explores methods to reduce energy use within a proposed building?

Options:

A.

Energy audit


B.

Building systems commissioning (Cx)


C.

Simple box energy analysis


D.

Mechanical systems inspection


Expert Solution
Questions # 13:

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if

Options:

A.

the Phase II ESA uncovers suspected contamination


B.

contamination was identified by the certified facility


C.

the certified facility's Phase I ESA is older than 180 days


D.

the local equivalent standard is more stringent than ASTM E1527-05


Expert Solution
Questions # 14:

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

Options:

A.

Planting density, soil conditions, irrigation efficiency and rainfall


B.

Relative humidity, site exposure, plant species and planting density


C.

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency


D.

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency


Expert Solution
Questions # 15:

U.S. Green Building Council (USGBC)'s vision for using LEED internationally includes

Options:

A.

allowing more stringent credit requirements for countries outside of the U.S. so that all projects can achieve LEED


B.

creating multiple LEED rating systems for different countries


C.

modifying U.S. reference standards, such as ASHRAE 90.1, to be more appropriate for regions outside the U.S.


D.

providing opportunities for alternative compliance paths that meet the unique needs of a particular region


Expert Solution
Questions # 16:

Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to

Options:

A.

earn Water Efficiency Credit, Water Metering


B.

earn Sustainable Sites Credit, Rainwater Management


C.

estimate and optimize water use in landscape designs


D.

estimate and optimize water use in outdoor fountains and pools


Expert Solution
Questions # 17:

For minimum acoustic performance, peak-hour is defined as M

Options:

A.

lowest noise level over a specified sample time


B.

highest noise level over various periods of time


C.

an energy-average of the noise level over a specified sample time


D.

an energy-average of noise level divided by total sample time and area of the space


Expert Solution
Questions # 18:

Which of the following would be classified as a public use faucet?

Options:

A.

Patient room sink


B.

Hotel sink


C.

Dorm room sink


D.

School classroom sink


Expert Solution
Questions # 19:

Which of the following is an example of a diverse use as defined by Location and Transportation Credit, Surrounding Density and Diverse Uses?

Options:

A.

Automated Teller Machine (ATM)


B.

Informal day care


C.

Public park


D.

Private university gym


Expert Solution
Questions # 20:

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, when should the Owner’s Project Requirements (OPR) be created and updated?

Options:

A.

Prior to beginning design and are generally not updated


B.

Once the project design is completed and edited throughout the project


C.

During predesign and are edited throughout the project


D.

After the design is completed and are generally not updated


Expert Solution