Summer Certification Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: force70

Pass the Cisco CCNP Data Center 350-601 Questions and answers with CertsForce

Viewing page 4 out of 13 pages
Viewing questions 31-40 out of questions
Questions # 31:

Question # 31

Refer to the exhibit. Software downgrade is required on a Cisco Nexus 7000 Series Switch. What is displayed when this command is executed?

Options:

A.

impact of a software upgrade in ISSU and chassis reload


B.

features and commands that are removed automatically from the configuration


C.

features that are enabled automatically after the downgrade


D.

compatibility of software in the system bootflash file


Expert Solution
Questions # 32:

An engineer must back up the Cisco UCS configuration. The backup job must meet these requirements:

• It must use the TCP protocol.

• Client identification must be verified before data is transmitted.

• The backup must contain all the system and logical configuration settings.

• The operations team requires that the backup file is in a human-readable format.

Which set of configurations must the engineer use?

Options:

A.

Type: System configurationProtocol: SFTP


B.

Type: Logical configurationProtocol: TFTP


C.

Type: All configurationProtocol: SCP


D.

Type: Full stateProtocol: SFTP


Expert Solution
Questions # 33:

Which action does Cisco UCS Manager perform during the firmware Auto-Install process?

Options:

A.

It downloads new firmware versions automatically.


B.

It checks compatibility with third-party software.


C.

It sends email notifications to administrators.


D.

It upgrades firmware and reboots necessary components.


Expert Solution
Questions # 34:

What is the impact of a nondisruptive upgrade on fabric and modular switches?

Options:

A.

During the upgrade. new devices cannot log in to the fabric.


B.

When the installation is complete, the system BIOS must be updated.


C.

If a zone server merge is in progress, the upgrade continues without interruption.


D.

The upgrade disrupts the control plane for more than 120 seconds.


Expert Solution
Questions # 35:

Refer to the exhibit. An engineer must Implement an Application Performance Monitoring (APM) for the production servers on the Cisco Nexus 93180 Series Switch-based Infrastructure in data center 1. The APM solution must meet these requirements:

    It must copy all inbound and outbound production traffic.

    It must support real-time telemetry.

Which configuration must be used on data center 1 switches to meet these objectives?

Question # 35

Options:

A.

Option A


B.

Option B


C.

Option C


D.

Option D


Expert Solution
Questions # 36:

Question # 36

Refer to me exhibit An engineer is troubleshooting a connectivity issue for a VM with MAC address 00:50:56:88:10:14 running on me cisco UCS-8 Series blade in VLAN 10. Cisco DCS Manager is connected to a Cisco nexus 9000 Series switch over port channel 10. Currently, the VM Is unreachable from any source that Is outside of me Cisco UCS domain. Which action musí be takenlo allow me VM to be readable?

Options:

A.

Allow VLAN 10 In the VPC peer link between the Cisco Nexus switches


B.

Allow VLAN 10 In the vSwitch at the hypervisor level.


C.

Allow VLAN 10 In a trunk between the Fabric interconnects and the Cisco Nexus snitches.


D.

Allow VLAN 10 In a trunk between the IOM and the Fabric Interconnects.


Expert Solution
Questions # 37:

Question # 37

Refer to the exhibit A network administrator experiences these issues with the network:

    PC1 is experiencing a buffering problem for video applications

    The servers that are connected to SW2 are experiencing packet drops when they connect to the Internet

The engineer wants to configure the required traffic capture to investigate the issue further Which configuration must be implemented to monitor the traffic?

Question # 37

Options:

A.

Option A


B.

Option B


C.

Option C


D.

Option D


Expert Solution
Questions # 38:

Question # 38

Refer to the exhibit. What is the outcome of this command when the EPLD is updated on a Cisco Nexus 9000 Series Switch?

Options:

A.

displays the impact of the upgrade on the operation of the switch


B.

shows a simulated upgrade of the EPLD


C.

displays the compatibility of the EPLD upgrade and the image in the bootflash


D.

upgrades the EPLD on the switch disruptively


Expert Solution
Questions # 39:

Drag and drop the Cisco Nexus 9000 Series Switch software update processes from the left onto the corresponding characteristics on the right.

Question # 39


Expert Solution
Questions # 40:

Question # 40

Question # 40

Refer to the exhibit. A network engineer must implement VXLAN between two core switches called CORE_2 and CORE_3. The core switches must have multicast disabled. In addition, the VLAN 100 called APP and VLAN 200 called DB must be extended between the core switches. The initial VXLAN configuration has been completed on CORE_2. Which Network Virtual Interface configuration completes VXLAN configura

A)

Question # 40

B)

Question # 40

C)

Question # 40

D)

Question # 40

Options:

A.

Option A


B.

Option B


C.

Option C


D.

Option D


Expert Solution
Viewing page 4 out of 13 pages
Viewing questions 31-40 out of questions