Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Pass the Cisco CCNP Data Center 350-601 Questions and answers with CertsForce

Viewing page 9 out of 11 pages
Viewing questions 81-90 out of questions
Questions # 81:

An engineer must optimize ARP responses and reduce unnecessary ARP broadcasts over the VXLAN/EVPN fabric. Which action accomplishes these tasks?

Options:

A.

Configure ip proxy-arp under the VLAN SVI associated with the VXLAN VNI.


B.

Configure ip proxy-arp within the VXLAN VNI configuration under the VTEP NVE interface.


C.

Configure suppress-arp within the VXLAN VNI configuration under the VTEP NVE interface


D.

Configure suppress-arp under the VLAN SVI associated with the VXLAN VNI.


Expert Solution
Questions # 82:

An engineer must deploy a new Cisco MDS 9000 Series Switch and be able to receive LinkUp/LinKDown notifications that were sent using a secure industry standard. Which technology must be used to accomplish this goal?

Options:

A.

PMON


B.

SPAN


C.

RMON


D.

SNMP


Expert Solution
Questions # 83:

An engineer must perform a backup and restore in Cisco UCS to rebuild the system in a disaster recovery scenario. The backup file must be encrypted to prevent the passwords from being

stored as cleartext. Which backup configuration meets these requirements?

Options:

A.

Full state backup over TFTP


B.

All configuration backup over SFTP


C.

System configuration backup over FTP


D.

Logical configuration backup over SCP


Expert Solution
Questions # 84:

Question # 84

Question # 84

Refer to the exhibits An engineer must implement a SPAN session that sends a copy of all VLAN 11 traffic on N5K_1 to the Traffic Capturing Device The configuration that is presented is already applied to the Cisco UCS Manager. Which additional action meets the objective?

Options:

A.

Assign the VLAN to the monitored port.


B.

Choose VLAN 11 under the VSANs section.


C.

Select the Clear Destination feature.


D.

Create a LAN traffic monitoring session.


Expert Solution
Questions # 85:

Which API standard is used to manage the UCS-X in Intersight Managed Mode?

Options:

A.

Blowfish


B.

XML


C.

WebRTC


D.

Redfish


Expert Solution
Questions # 86:

Question # 86

Refer to the exhibit During a vPC peer switch reload, there is packet loss between the server and the router Which action must be taken to prevent this behavior during future reloads?

Options:

A.

Set the routed uplink ports of the Cisco Nexus peers as orphans.


B.

Increase the vPC delay restore timer.


C.

Decrease the OSPF hello and dead interval timers.


D.

Disable vPC ARP synchronize on the vPC peers.


Expert Solution
Questions # 87:

Question # 87

Refer to the exhibit. Which command set must be used to complete the configuration that configures a Cisco Nexus 9000 Series server scheduler to perform the backup of It’s configuration every Wednesday at 8:00 am?

Question # 87

Options:

A.

Option A


B.

Option B


C.

Option C


D.

Option D


Expert Solution
Questions # 88:

An engineer configures multiple blade servers for OS installation. The requirements are to use the internal HDDs inside the Cisco UCS blade server and for the OS to remain operational even if one of the HDDs is removed for maintenance. Each blade has two internal HDDs. Which two actions must be taken to meet these requirements? (Choose two.)

Options:

A.

Set Enforce vNIC/vHBA/iSCSI Name to disabled


B.

Set the Local Disk Policy Mode to RAID 1.


C.

Set the First Boot Order to be Local LUN.


D.

Set Boot Policy Mode to UEFI


E.

Set the Protect Configuration to enabled


Expert Solution
Questions # 89:

An engineer needs to create a new user in the local user database on Cisco UCS Fabric Interconnect. The user needs permissions to change the following configuration inside UCS Manager version 3.1:

• vNIC and vHBA profiles

• Fan speed and power redundancy profile of UCS Manager

Which two roles must be assigned to a user to achieve this goal? (Choose two.)

Options:

A.

server-compute


B.

facility-manager


C.

operations


D.

server-equipment


E.

server-profile


Expert Solution
Questions # 90:

Which two statements describe the process of upgrading an EPLD on a Cisco MUS 9000 Series Switch? (Choose two)

Options:

A.

EPLDs are capable to be upgraded without replacing the hardware


B.

The EPLDs for all the modules on a switch must be upgraded at the same time.


C.

An upgrade verification identities tit impact of each EPLO upgrade


D.

ER Ds are only capable to be upgraded to the latest FPL D image


E.

EPLD upgrades are capable to be completed without powering down the module during the upgrade


Expert Solution
Viewing page 9 out of 11 pages
Viewing questions 81-90 out of questions