Questions # 81:

Which strategy promotes sustainable purchasing during construction?

Options:

A.

Specify green electronic equipment


B.

Develop a construction purchasing policy


C.

Reduce regional materials expense by 10%


D.

Implement an erosion and sedimentation plan


Expert Solution
Questions # 82:

Which of the following plans is implemented after occupancy?

Options:

A.

Green Cleaning


B.

Value Engineering


C.

Fundamental Commissioning (cx)


D.

Stormwater Pollution Prevention


Expert Solution
Questions # 83:

What are the values and benefits of building green?

Options:

A.

It will encourage others to build green


B.

It will lower the price for green materials


C.

It will enhance the health of the building occupants


D.

It is not as expensive to build as conventional design buildings


Expert Solution
Questions # 84:

When considering strategies for reducing indoor water use, which plumbing fixture would be excluded?

Options:

A.

Urinal


B.

Drip irrigation


C.

Showerhead


D.

Kitchen faucet


Expert Solution
Questions # 85:

The Interior space of a six-story commercial building is being completely renovated. Which of the following actions should the design team conduct first in order to incorporate green building strategies?

Options:

A.

Set project goals


B.

Identify improvement opportunities


C.

Benchmark performance of existing building


D.

Measure performance and undergo third party verification


Expert Solution
Questions # 86:

Which Is a component of a construction waste management plan?

Options:

A.

List of materials to be diverted from disposal


B.

Projected cost savings from diverting waste


C.

Quantity of waste generated from excavated soil


D.

Distance of the recycling facility from the project site


Expert Solution
Questions # 87:

The Commissioning (Cx) Process has been structured to coincide with the phases of a generic project in which of the following sequences of phases?

Options:

A.

OPR, Design, Construction, Operations and Maintenance


B.

Basis of Design (BOD), OPR, Cx, Construction


C.

Pre-Design, Design, Construction, Occupancy and Operations


D.

Basic Design, Construction, Cx, Owner’s Project Requirements (OPR)


Expert Solution
Questions # 88:

EPA's ENERGY STAR Portfolio Manager is used for measuring

Options:

A.

embodied energy


B.

only ongoing water performance


C.

only ongoing energy performance


D.

ongoing energy and water performance


Expert Solution
Questions # 89:

Volatile organic compounds (VOCs) negatively impact which of the following entities?

Options:

A.

Quality of daylight


B.

Quality of indoor air


C.

Durability of a product


D.

Ability to recycle a product


Expert Solution
Questions # 90:

Which of the following processes is conducted prior to building occupancy and removes indoor airbome contaminants by thoroughly exhausting old air and replacing it with fresh outdoor air?

Options:

A.

Bake-out


B.

Flush-out


C.

Air ejection


D.

Hot box analysis


Expert Solution