Questions # 51:

Which of the following strategies contributes to reducing heat island effect and managing rainwater runoff?

Options:

A.

A vegetated roof


B.

White cement roof pavers


C.

A rainwater collection system


D.

Shading structures that include photovoltaic panels


Expert Solution
Questions # 52:

Which of the following stakeholders are involved in the feedback mechanism?

Options:

A.

Occupants


B.

Civil Engineer


C.

Landscape Architect


D.

Building Energy Modeler


Expert Solution
Questions # 53:

A project team has three principal participants with LEED AP credentials. One is an energy modeler, one is a civil engineer and the third one is a general contractor. Under which category can their credentials contribute a point?

Options:

A.

Innovation


B.

Commissioning (Cx)


C.

Sustainable Sites


D.

Energy and Atmosphere


Expert Solution
Questions # 54:

The amount of landfill-destined waste generated during project construction can be reduced by requiring the general contractor to

Options:

A.

burn paper and cardboard materials on-site


B.

use contractor vehicles to disperse waste materials to multiple disposal sites within the project region


C.

follow requirements for using dimensional construction materials, prefabrication or material efficient framing


D.

take advantage of municipal waste pick-up to reduce the weight of the project's construction material scraps


Expert Solution
Questions # 55:

Energy and Atmosphere Credit encompasses

Options:

A.

site selection, site design and environmental concerns


B.

integrative process, building loads and EQ


C.

building loads, energy performance management and EQ


D.

building loads, energy performance management and environmental concerns


Expert Solution
Questions # 56:

What is the process that is performed on existing buildings to identify and recognize system improvements that make the building more suitable for current use?

Options:

A.

Energy modeling


B.

Retrocommissioning


C.

Life-cycle assessment


D.

Fundamental Commissioning (Cx)


Expert Solution
Questions # 57:

Which of the following power sources are considered green power?

Options:

A.

Natural gas


B.

Biomass


C.

Nu clear


D.

Clean coal


Expert Solution
Questions # 58:

Which is an example of regenerative design?

Options:

A.

Passive house energy building


B.

A building with a recycling program


C.

A project that uses sustainable materials


D.

A building that generates electricity and sends the excess to the grid


Expert Solution
Questions # 59:

Which of the following approaches refers to the identification and quantification of environmental effects throughout the life of the materials andproducts used in a project as well as the project itself?

Options:

A.

Commissioning


B.

Integrative process


C.

Life-cycle costing (LCC)


D.

Life-cycle assessment (LCA)


Expert Solution
Questions # 60:

Which of the following may be awarded to a Green Building professional who "distinguishes professional leadership, contribution to the standards of practice and body of knowledge and continual improvement in the field"?

Options:

A.

LEED Fellow


B.

LEED Green Associate


C.

LEED for Homes Green Rater


D.

LEED AP