Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-Green-Associate Questions and answers with CertsForce

Viewing page 4 out of 10 pages
Viewing questions 31-40 out of questions
Questions # 31:

Which formula is used for calculation of the percentage of restoration area?

Options:

A.

Percentage of restoration area = (Disturbed area I Restoration site area) x 100


B.

Percentage of restoration area = (Restoration area / Total previously disturbed site area) x 100


C.

Percentage of restoration area = (Restoration area / Total proposed restoration site area) x 100


D.

Percentage of restoration area = (Restoration area / Total previously undisturbed site area) x 100


Expert Solution
Questions # 32:

What plumbing fixture eliminates water use?

Options:

A.

Dual-flush toilet


B.

Low-flow lavatory


C.

WaterSense-labeled toilet


D.

Composting toilet


Expert Solution
Questions # 33:

Which statement is the U.S. Green Building Council vision?

Options:

A.

A transformed built environment leading to a sustainable future


B.

Buildings and communities will regenerate and sustain the health and vitality of all life within a generation


C.

Meeting the goals of the Paris Agreement and improving the lives of millions of citizens through better buildings


D.

To transform the building and construction sector across three strategic areas - climate action, health and wellbeing and resources and circularity


Expert Solution
Questions # 34:

What is the primary purpose of using low cubicle partitions in office buildings?

Options:

A.

To reduce Volatile Organic Compounds (VOCs) levels


B.

To reduce CO₂ levels


C.

To increase the spread of daylight


D.

To increase thermal comfort


Expert Solution
Questions # 35:

A company is considering investing in green power for its operations facilities, but is reluctant because of the high capital investment, maintenance costs and slow initial financial returns. Which of the following is a practical strategy to help the company overcome these obstacles?

Options:

A.

Relocate the company to a region that is better suited for harnessing renewable energy


B.

Divert the company's research and development funds to investment in large scale hydroelectric power


C.

Host an on-site renewable energy generation system and agree to buy the power without owning the equipment


D.

Hire employees to staff a new operations department in preparation for the maintenance needs of the new renewable energy equipment


Expert Solution
Questions # 36:

When instituting a construction waste management plan, which of the following should be tracked?

Options:

A.

Number Of dumpsters used


B.

Volume/weight of materials diverted


C.

Amount of site soils reused on the site


D.

Amount of post-consumer recycled content


Expert Solution
Questions # 37:

Which ASHRAE standard defines thermal comfort for building occupants?

Options:

A.

ASHRAE 55


B.

ASHRAE 189.1


C.

ASHRAE 62.1


D.

ASHRAE 90.1


Expert Solution
Questions # 38:

Which of the following practices ensures that building systems are designed efficiently, installed appropriately and operate as intended?

Options:

A.

Positive feedback loop


B.

Negative feedback loop


C.

Building commissioning


D.

Building retrocommissioning


Expert Solution
Questions # 39:

What is the primary purpose of using low-emitting partitions in office buildings?

Options:

A.

To reduce CO₂ levels


B.

To increase thermal comfort


C.

To increase spread of daylight


D.

To reduce volatile organic compounds (VOCs) levels


Expert Solution
Questions # 40:

Which of the following standards addresses guidance for sustainable construction in complying with building codes?

Options:

A.

ASHRAE 72


B.

ASHRAE 62.1


C.

ASHRAE 90.1


D.

ASHRAE 189.1


Expert Solution
Viewing page 4 out of 10 pages
Viewing questions 31-40 out of questions