Questions # 21:

When a project team sustainably develops a project site, the design should

Options:

A.

increase water runoff


B.

maximize construction pollution


C.

remediate sites already in decline


D.

replace natural water flow patterns


Expert Solution
Questions # 22:

What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?

Options:

A.

LEED V5, LEED for Neighborhood Development Conditional Approval


B.

LEED for Neighborhood Development Pilot, Stage 3 LEED for Neighborhood Development Certified Project


C.

LEED for Neighborhood Development Pilot, Stage 1 LEED for Neighborhood Development Pre-reviewed Plan


D.

LEED 2009, Stage 1 Conditional Approval of LEED for Neighborhood Development Plan


Expert Solution
Questions # 23:

A project includes an automatic transfer switch and controls that enable the building’s on-site renewable-energy systems, energy storage, and critical equipment to operate during a power outage. What is this capability called?

Options:

A.

Load management


B.

Islanding


C.

Demand response


Expert Solution
Questions # 24:

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

Options:

A.

Owner


B.

Contractor


C.

Occupants


D.

Facility manager


Expert Solution
Questions # 25:

In order for a product to contribute to Materials and Resources Credit, Building Product Disclosure and Optimization, Environmental Product Declarations, Option 1. Environmental Product Declaration, the product needs to be

Options:

A.

Forest Stewardship Council (FSC)-certified


B.

cradle-to-cradle certified


C.

third-party verified in a Corporate Sustainability Report (CSR)


D.

critically reviewed life-cycle assessment conforming to ISO 14044


Expert Solution
Questions # 26:

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.

Measure densities within a 1/4 mi. (0.40 km) radius of the project boundary


B.

Measure densities within a 1/2 mi. (0.80 km) radius of the project boundary


C.

Measure densities within a 1/3 mi. (0.53 km) radius of the project boundary


D.

Measure densities within a 3/4 mi. (1.20 km) radius of the project boundary


Expert Solution
Questions # 27:

Which energy efficient lamp type is free from mercury?

Options:

A.

Compact Fluorescent


B.

High Pressure Sodium


C.

Light Emitting Diode


D.

T-8 Fluorescent


Expert Solution
Questions # 28:

Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?

Question # 28

Options:

A.

A, B, C


B.

B, C, D


C.

C, D, E


D.

A, B, D


Expert Solution
Questions # 29:

What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.

Office


B.

Hospital


C.

Warehouse


D.

Data Center


Expert Solution
Questions # 30:

Which of the following actions should a project team implement to minimize human and ecological health impacts through material selection while pursuing MRc2: Reduce Embodied Carbon?

Options:

A.

Avoid materials imported over long distances


B.

Select products with ISO-verified Type III Environmental Product Declarations


C.

Select materials that provide only basic recycling information


Expert Solution
Viewing page 3 out of 13 pages
Viewing questions 21-30 out of questions