Questions # 1:

What is a common strategy to minimize thermal bridging in building design to reduce peak thermal loads?

Options:

A.

Incorporate continuous insulation throughout the building envelope


B.

Use heavier construction materials to delay heat transfer


C.

Install thicker wall assemblies with thermal breaks


Expert Solution
Questions # 2:

Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?

Options:

A.

Ground-source heat pumps


B.

Tidal-based electrical production


C.

Municipal solid waste combustion


D.

Passive solar and daylighting strategies


Expert Solution
Questions # 3:

Which of the following will contribute to reducing the heat island effect?

Options:

A.

Artificial turf grass


B.

Intensive vegetated roof


C.

Steep sloped roof with initial SRI of 35


D.

Low sloped roof with initial Solar Reflectance Index (SRI) of 64


Expert Solution
Questions # 4:

Which of the following organizations is responsible for providing alternative compliance paths that reflect regional variations for LEED credits?

Options:

A.

U.S. Environmental Protection Agency (EPA)


B.

International Energy Agency (IEA)


C.

U.S. Green Building Council (USGBC)


Expert Solution
Questions # 5:

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

Options:

A.

3%


B.

1%


C.

2%


D.

4%


Expert Solution
Questions # 6:

Which of the following features is commonly included in a building’s leak-detection system to enhance water efficiency?

Options:

A.

Real-time monitoring and alerts


B.

Water-use prediction algorithms based on weather data


C.

Monthly water-use analysis reports


Expert Solution
Questions # 7:

Which is a benefit of earning Regional Priority credits?

Options:

A.

The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project's location


B.

The context of the project's location is not addressed, allowing the project team to focus on the building's priority issues


C.

The project's operations are considered separately from design and construction, allowing the project team to focus on regional issues


D.

The LEED project is able to skip a review phase by considering the issues that are a priority in the project's location


Expert Solution
Questions # 8:

What requirement must be met when creating a Demand Response Program that satisfies Energy and Atmosphere Credit, Demand Response?

Options:

A.

Permanently reduce the energy consumption in the building by 5%


B.

Demonstrate submetering of the two highest electrical end uses


C.

Demonstrate a load shift reduction of 5% in the building


D.

Create a comprehensive plan for meeting a demand response event


Expert Solution
Questions # 9:

An electrical team installs photovoltaic panels over a parking lot. This action contributes to which of the following credits?

Options:

A.

Optimize Energy Performance


B.

Light Pollution Reduction


C.

Low-Emitting Materials


D.

Demand Response


Expert Solution
Questions # 10:

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

Options:

A.

verification that a weighted daily average has been used for each qualifying route


B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop


C.

verification that a weighted building average has been used for each qualifying functional entry


D.

confirmation that each qualifying route features paired route service (service in opposite directions)