Questions # 81:

Which of the following scenarios contributes to earning credit under MRc1: Materials and Resources, Option 2. Materials Reuse?

Options:

A.

Donate salvaged wood to a local nonprofit organisation that repurposes materials


B.

Reuse salvaged metal beams in the construction of the new project


C.

Sell recovered bricks to a salvage retailer for off-site reuse


Expert Solution
Questions # 82:

According to the Integrative Process Credit, Integrative Process, the goal-setting workshop should identify

Options:

A.

potential project sites


B.

targeted LEED credits


C.

expected water demand


D.

expected energy demand


Expert Solution
Questions # 83:

A new school with a 20 car parking lot has set aside four preferred parking spaces for green vehicles. What else must the project team provide to achieve Location and Transportation Credit, Green Vehicles?

Options:

A.

Nothing; the project team has met the credit requirements


B.

Provide secure bike racks for 5% of the building occupants


C.

Provide an additional parking space for a low-emitting and fuel-efficient vehicle


D.

Provide qualifying electrical vehicle supply equipment in 2% of all parking spaces


Expert Solution
Questions # 84:

The owner of a 40,000 ft² (3,716 m²) site containing a one-story museum with a 10,000 ft² (929 m²) building footprint and 5,000 ft² (465 m²) of native vegetated landscaping purchases an adjacent 30,000 ft² (2,787 m²) concrete surface parking lot.

The owner plans to construct a 10,000 ft² (929 m²) museum addition and an adjacent exterior sculpture garden.

What is the minimum area of the sculpture garden that must be covered with native or adapted vegetated ground cover to achieve SSc1: Biodiverse Habitat?

Options:

A.

3,000 ft² (278 m²)


B.

14,000 ft² (1,300 m²)


C.

12,000 ft² (1,115 m²)


D.

10,000 ft² (929 m²)


Expert Solution
Questions # 85:

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

Options:

A.

Entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year


B.

Within a floodplain subject to a 3% or greater chance of flooding every other year


C.

Outside any floodplain subject to a 2% or greater chance of flooding in any given 5-year period


D.

Entirely outside any floodplain subject to a 3% or greater chance of flooding in any given 10-year period


Expert Solution
Questions # 86:

Which of the following is an example of a diverse use as defined by Location and Transportation Credit, Surrounding Density and Diverse Uses?

Options:

A.

Automated Teller Machine (ATM)


B.

Informal day care


C.

Public park


D.

Private university gym


Expert Solution
Questions # 87:

Under LTc3: Compact and Connected Development, Option 1. Surrounding Density, how far from the project site should project teams measure surrounding density?

Options:

A.

0.5 mi. (0.80 km)


B.

1 mi. (1.61 km)


C.

0.25 mi. (0.40 km)


Expert Solution
Questions # 88:

Which of the following strategies will aid in reducing indoor water use?

Options:

A.

Design drip irrigation for landscape


B.

Use high-efficiency HVAC systems


C.

Exclude janitor closets in the building


D.

Optimize consumption of showerheads


Expert Solution
Questions # 89:

In what way can synergies between LEED credits enhance sustainability outcomes on a project?

Options:

A.

Use low-emitting materials to optimise energy performance, contributing to Materials and Resources and Energy and Atmosphere credits


B.

Install a green roof to reduce the heat-island effect and improve energy efficiency, contributing to Sustainable Sites and Energy and Atmosphere credits


C.

Choose materials with high recycled content to improve thermal comfort, contributing to Materials and Resources and Indoor Environmental Quality credits


Expert Solution
Questions # 90:

When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?

Options:

A.

Perform a preliminary water budget analysis before the completion of schematic design


B.

Install permanent metering on both the water sources and the waste water leaving the site


C.

At the completion of schematic design, count the fixtures and apply the maximum flow rate


D.

Estimate consumption by using 20 gal. per day (76 I per day) for each Full Time Equivalent (FTE) scheduled to occupy the building


Expert Solution