Halloween Sale Special Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: CFsave75

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-AP-BD+C Questions and answers with CertsForce

Viewing page 2 out of 14 pages
Viewing questions 11-20 out of questions
Questions # 11:

A developer is building a new shopping mall in a temperate climate. The developer wants to reduce operating costs and improve occupant experience. Which design scheme should the project team present?

Options:

A.

A design that increases peak thermal loads in the office and administrative spaces


B.

A design that reduces the overall parking footprint and provides preferred parking for electric-vehicle charging


C.

A design with a narrow floor plate that maximizes daylight in retail areas and minimizes the need for electric lighting


D.

A design with a large roof that collects rainwater to reduce stormwater runoff


Expert Solution
Questions # 12:

What is the minimum percentage of gross floor area that must be complete for a project to use LEED BD+C: New Construction and Major Renovations?

Options:

A.

40%


B.

100%


C.

60%


Expert Solution
Questions # 13:

When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the Construction General Permit must contain which of the following?

Options:

A.

Waste Management Plan


B.

Building orientation on the site


C.

Installation plan for perimeter control


D.

Minimum standards for equipment exhaust


Expert Solution
Questions # 14:

A school wants to incorporate natural daylighting in classrooms on all sides of the building. What can the project design team explain to the school district about how this strategy will affect the operational energy cost?

Options:

A.

Heat gain will reduce the air conditioning load


B.

Having the lights off reduces the electricity use


C.

Reduction in lighting fixture use reduces re-lamping


D.

There would be passive solar heating benefits to all of the classrooms


Expert Solution
Questions # 15:

For Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan, which of the following

items is required for credit compliance?

Options:

A.

MERV 13 (F7) filtration media


B.

Indoor Environmental Quality test results


C.

Photographic documentation


D.

Separating construction waste


Expert Solution
Questions # 16:

An accessible garden planted with native plants contributes to the achievement of which of the following credit pairs?

Options:

A.

Sustainable Sites Credit, Sensitive Land Protection; Sustainable Sites Credit, Site Development - Protect or Restore Habitat


B.

Sustainable Sites Credit, Open Space; Sustainable Sites Credit, Rainwater Management


C.

Water Efficiency Credit, Water Metering; Sustainable Sites Credit, Tenant Design and Construction Guidelines


D.

Location and Transportation Credit, Surrounding Density and Diverse Uses; Sustainable Sites Credit, Site Assessment


Expert Solution
Questions # 17:

Which of the following pairs of strategies can help reduce the landscape water demand beyond the prerequisite level in Water Efficiency Credit, Outdoor Water Use Reduction?

Options:

A.

Mulched paths and weather sensor controls


B.

Artificial turf grass and alternative water sources


C.

Plant species selection and permeable pavement


D.

Alternative water sources and smart scheduling technology


Expert Solution
Questions # 18:

Which of the following strategies reflects a synergy between EQc2: Occupant Experience, Option 5. Lighting Environment and Energy and Atmosphere credits?

Options:

A.

Design open spaces to support community interaction and connectivity while preserving natural site topography and ecological balance


B.

Introduce light pipes into enclosed areas that do not have direct exposure to the exterior


C.

Use double-glazed windows to improve thermal comfort while ensuring uniform temperature distribution


Expert Solution
Questions # 19:

A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental

Quality Strategies, where would CO2 monitors need to be located?

Options:

A.

In each occupied space


B.

In each densely occupied space


C.

In each occupied space and outdoors


D.

In each occupied space over 500 ft2 (46 m2)


Expert Solution
Questions # 20:

Which of the following would be classified as a public use faucet?

Options:

A.

Patient room sink


B.

Hotel sink


C.

Dorm room sink


D.

School classroom sink


Expert Solution
Viewing page 2 out of 14 pages
Viewing questions 11-20 out of questions