The logical overview of the data center looks as pictured below. To what TIA-942 Rating is this design made based on electrical only?
What is the main disadvantage of using a ToR (Top of Rack) design?
The building in which the computer room is housed is required to have a sprinkler system. The building is therefore equipped with a wet pipe system.
What action, if any, should you recommend for the computer room?
What is the risk of high levels of hydrogen sulfide (H₂S) in the computer room?
In which stage of the data center life cycle does commissioning take place?
You are installing new copper cabling.
What is the advantage or disadvantage of choosing pre-terminated category 6 or 6A cabling?
A computer room is fitted with a hypoxic-based fire suppression system. On what principle does it work?
What is forced entry resistance based on?
From the options indicated, what is the correct starting point for the raised floor installation?

What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire extinguishing system?