A new network storage device in a non-standard size rack of approximately 600 kg/1,300 lbs is going to be installed in the data center.

Are new floor loading calculations required?

Options:

A.

No, as long as the equipment is less than 700 kg/1,500 lbs it will be within the limits.


B.

No, specifications of equipment brought into the data center will already be known during the design of the data center, and therefore the floor will be able to handle it.


C.

Yes, additional floor loading calculations need to be done by the floor manager, which should be verified by the safety engineer.


D.

Yes, a structural engineer, approved/endorsed by the building owner, should carry out new floor loading calculations.


Expert Solution
Questions # 32:

A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not available.

What type of generators should be installed?

Options:

A.

Standby generators should be installed in at least an N+1 configuration


B.

Continuous generators should be installed, at least in an N+1 configuration


C.

A combination of standby-, prime-, and continuous-generators, as the duration of the power outage is unpredictable. The total available capacity of the generators should be at least 500% of the data center load


D.

Continuous generators should be installed; no N+1 configuration is needed as the generators will run all the time


Expert Solution
Questions # 33:

When designing a data center network, your company wants to minimize the number of network switches to manage.

What type of physical cabling layout would be the best choice?

Options:

A.

ToR (Top of Rack) design


B.

EoR (End of Row) design


C.

Star network design using coaxial cables


D.

It does not matter as the number of switches is not influenced by the physical cabling layout


Expert Solution
Questions # 34:

What is the focus of the Open Compute Project (OCP)?

Options:

A.

Saving energy, materials, and costs


B.

Standardizing equipment only for hyperscale data centers


C.

Developing an open-source operating system


D.

Making cloud computing more accessible


Expert Solution
Questions # 35:

Do all residual current devices (RCDs) use the same operating principle?

Options:

A.

Yes, they all detect current differences on live and neutral wire


B.

Yes, they all measure voltage on the earth conductor


C.

No, ELCB measures earth voltage, whereas RCD detects current differences


D.

No, depending on regulations some use thermal-magnetic operation


Expert Solution
Questions # 36:

The logical overview of the data center looks as pictured. To what TIA-942 Rating is this design made based on electrical only?

Question # 36

Options:

A.

Rating - 4


B.

Rating - 3


C.

Rating - 2


D.

Rating - 1