A conduit run is installed from the ER to a TR. It has two (2) 90 degree bend and a length of 20 m (65 ft). What will be the MINIMUM test rating of the pull cord left in the conduit?
The standard floor space coverage area for each building automation system (BAS), is a BAS outlet or device for every_______ of floor space.
When placing an optical fiber cable in the horizontal optical fiber cabling subsystem, what is the MAXIMUM number of splices that can be used?
You are designing a horizontal pathway system where you will provide 100 mm (4 in) conduit and pull boxes. The building architectural elements will only allow for a single layer of conduits (not stacked). The main horizontal pathway system consists of five 100 mm (4 in) conduits. Large single sheath copper cables are not expected to be placed. Which of the following is the MINIMUM width pull box that is to be provided?
Which of the following is true when describing slip sleeves or gutters?
Which area of project management covers the blending of various subteams into a project organization with a cohesive plan?
What is the PERT estimate of time for cable placement on a given job?
- Optimistic time is 100 hours
- Most likely time is 125 hours
- Pessimistic time is 210 hours
Select the appropriate task to complete section 2.2 of the work breakdown structure (WBS) below:
2 Technician
2.1 Install cabling
2.2 __________
2.3 Activate wireless
Between the late 60’s and until 1984, what was the service that was to help architects and engineers better design and implement pathways and spaces in commercial buildings for telephone communications?
At the end of the second week of a project, the earned value (EV) of work is $8000 USd and the planned value (PV) of work is $7000 USd. What is true about the project?