Select the appropriate task to complete section 2.2 of the work breakdown structure (WBS) below:

2 Technician

2.1 Install cabling

2.2 __________

2.3 Activate wireless


A.

Install access point


B.

Clean work area


C.

Install pathway for cabling


D.

Confirm wireless coverage