Which of the following outcomes Is a benefit of mixed-model scheduling?

Options:

A.

Increased inventory


B.

Improved demand response


C.

Fewer setups


D.

Fewer material shortages


Expert Solution
Questions # 32:

When starting an external benchmarking study, a firm must first:

Options:

A.

determine the metrics which will be measured and compared.


B.

identify the target firms with which to benchmark against.


C.

understand its own processes and document performance.


D.

determine its areas of weakness versus the competition's.


Expert Solution
Questions # 33:

In the design and development of a manufacturing process, process engineers would most likely be responsible for decisions relating to:

Options:

A.

lead times.


B.

production capacity.


C.

product reliability.


D.

routing sequences.


Expert Solution
Questions # 34:

Which of the following activities is an example of collaboration between suppliers and operations which would give more lead time visibility?

Options:

A.

Conducting a facility tour for a supplier


B.

Sharing of demand data with a supplier


C.

Sending the supplier an annual forecast for materials


D.

Conducting a qualification meeting with the supplier of a new material


Expert Solution
Questions # 35:

A firm that currently produces all items to stock is implementing the concept of postponement in all new product designs. Which of the following outcomes is most likely to result?

Options:

A.

Product variety will decrease.


B.

Sales volume per product family will increase.


C.

Number of finished items stocked will decrease.


D.

Number of component items stocked will increase.


Expert Solution
Questions # 36:

Which of the following actions will result In lower inventory levels?

Options:

A.

Level load the master production schedule (MPS).


B.

Reduce replenishment lead times.


C.

Increase customer service level.


D.

Decentralize inventory locations.


Expert Solution
Questions # 37:

An example of an assignable cause of variation in process performance is:

Options:

A.

power fluctuation during machine operation.


B.

machine vibration during operation.


C.

incorrect setup of a machine by the operator.


D.

changes in temperature in the machine shop.


Expert Solution
Questions # 38:

In Company XYZ, transaction-costing capability has been Integrated into the shop floor reporting system. A batch of 20 units was started in production. At the fourth operation, 20 units are reported as complete. At the fifth operation, 25 units are reported as complete. When all operations are complete, 20 units are checked into the stockroom. If the error at the fifth operation is undetected, which of the following conditions will be true?

Options:

A.

Stockroom inventory balance will be incorrect.


B.

Operator efficiency for the fifth operation will be overstated.


C.

Units in process will be understated.


D.

Work-in-process (WIP) cost will be understated.


Expert Solution
Questions # 39:

Which of the following environments is most suitable for the use of kanban systems?

Options:

A.

Short product life cycles


B.

High levels of customization


C.

Intermittent production


D.

Stable and predictable demand


Expert Solution
Questions # 40:

We have observed the inventory system does not handle plastic parts well." What should be added to the problem statement to make it more useful?

Options:

A.

Measurements that help describe the problem


B.

Guidance to which problem-solving tools should be used


C.

Criteria for selecting the improvement team


D.

Description of who is responsible for the problem