Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Pass the Pure Storage FAIS FlashArray-Implementation-Specialist Questions and answers with CertsForce

Viewing page 6 out of 7 pages
Viewing questions 51-60 out of questions
Questions # 51:

Which PCI cards must be validated on the Bill of Materials (BOM) to allow an Implementation Engineer to attach a DirectFlash Shelf to a FlashArray//XL130R5?

Options:

A.

FA-XL-200G Ethernet/RoCE 2-Port


B.

FA-XL-100G iSCSI/RoCE 2-Port


C.

FA-XL-100G Ethernet/RoCE 2-Port


Expert Solution
Questions # 52:

An evacuation is already in progress when the Account Team informs the Implementation Engineer that the customer wants to include another data pack to the evacuation. How should the Implementation Engineer proceed with this request?

Options:

A.

Issue a new evacuation command and the FlashArray will add it to the current evacuation job.


B.

Cancel the current evacuation and start a new evacuation with the additional packs or shelves included.


C.

Wait for the current evacuation to complete before starting a new one.


D.

Pause the current evacuation, add the pack, and resume the process.


Expert Solution
Questions # 53:

What are the default replication ports on all three rack unit (3U) FlashArray models?

Options:

A.

ETH0 and ETH1


B.

ETH2 and ETH3


C.

ETH4 and ETH5


D.

ETH6 and ETH7


Expert Solution
Questions # 54:

What is the longest supported cable length for use with DirectFlash shelves?

Options:

A.

3 meter


B.

5 meter


C.

7 meter


Expert Solution
Questions # 55:

An Implementation Engineer has completed a hardware NDU, but after the upgrade, Purity reports a "health not responding" status when running status. Before contacting support, which command should the Implementation Engineer run to review a list of possible logged issues?

Options:

A.

puremessage list --open --hidden


B.

purearray diagnose --log


C.

purealert watcher list


Expert Solution
Questions # 56:

An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Mode). What is the next step the Implementation Engineer should take to continue the upgrade?

Options:

A.

Hot swap and move each DMM into any open //XL slot.


B.

Evacuate and remove each DMM one-by-one then set aside.


C.

Evacuate DMM's as a datapack then install into any slot in //XL.


Expert Solution
Questions # 57:

Refer to the following output:

Ping successful with CCM

What does this indicate?

Options:

A.

Controller has successfully connected to pure1


B.

Controller has successfully connected to the Fusion Fleet Coordinator


C.

Cross-controller link has successfully connected between controllers


Expert Solution
Questions # 58:

An Implementation Engineer needs to run the puresetup replace procedure on a FlashArray//XR5 during a controller upgrade. What command should the engineer run to identify the array model?

Options:

A.

hwconfig --all


B.

pureversion -a


C.

hwconfig --model


Expert Solution
Questions # 59:

What command should the Implementation Engineer run to configure a proxy?

Options:

A.

purearray setattr --proxy https://yourproxyserver:1234


B.

puresetup proxy https://yourproxyserver:1234


C.

purearray configure --proxy url https://example.proxy.server


D.

purenetwork proxy set https://yourproxyserver:1234


Expert Solution
Questions # 60:

An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?

Options:

A.

Primary


B.

Secondary


C.

Standby


Expert Solution
Viewing page 6 out of 7 pages
Viewing questions 51-60 out of questions