Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Pure Storage Pure Certified FlashArray Implementation Specialist (FAIS) Exam FlashArray-Implementation-Specialist Question # 56 Topic 6 Discussion

Pure Storage Pure Certified FlashArray Implementation Specialist (FAIS) Exam FlashArray-Implementation-Specialist Question # 56 Topic 6 Discussion

FlashArray-Implementation-Specialist Exam Topic 6 Question 56 Discussion:
Question #: 56
Topic #: 6

An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Mode). What is the next step the Implementation Engineer should take to continue the upgrade?


A.

Hot swap and move each DMM into any open //XL slot.


B.

Evacuate and remove each DMM one-by-one then set aside.


C.

Evacuate DMM's as a datapack then install into any slot in //XL.


Get Premium FlashArray-Implementation-Specialist Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.