Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Pass the Pure Storage FAIS FlashArray-Implementation-Specialist Questions and answers with CertsForce

Viewing page 1 out of 5 pages
Viewing questions 1-10 out of questions
Questions # 1:

A dark site customer requests an evacuation of SH01 on a FlashArray/M50. What is an appropriate next step?

Options:

A.

Use the evac_checks script.


B.

Ensure that usable capacity is less than 80%.


C.

Ensure that usable capacity is less than 90%.


Questions # 2:

After running puredb run giveback --safe command once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?

Options:

A.

3 minutes


B.

5 minutes


C.

10 minutes


Questions # 3:

An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?

Options:

A.

ETH 10/11


B.

ETH 0/1


C.

ETH 18/19


Questions # 4:

What are the default replication ports on all three rack unit FlashArray models?

Options:

A.

ETH2 and ETH3


B.

ETH4 and ETH5


C.

ETH0 and ETH1


Questions # 5:

An Implementation Engineer has completed a hardware NDU, but after the upgrade, Purity reports a "health not responding" status when running status. Before contacting support, which command should the Implementation Engineer run to review a list of possible logged issues?

Options:

A.

puremessage list --open --hidden


B.

purearray diagnose --log


C.

purealert watcher list


Questions # 6:

On a FlashArray//X50 R2/R3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?

Options:

A.

2-port in slot 0


B.

2-port in slot 2


C.

4-port in slot 0


Questions # 7:

What is the rack unit height of a FlashArray//XR2/3?

Options:

A.

3


B.

4


C.

5


Questions # 8:

During a HWNDU, the Implementation Engineer initializes CT0 and runs health checks. They observe 12 fewer iSCSI connections compared to pre-upgrade results. While reviewing port speed and status, the output shows CT0.ETH14 at 0.00 b/s. What is the first action the Implementation Engineer should take to troubleshoot?

Options:

A.

Swap the SFP from CT0.ETH14 to the unused management port in CT0.ETH5 and re-check port speed.


B.

Ask the customer to verify which hosts have missing paths and have them reboot the affected hosts.


C.

Ensure the SFP in CT0.ETH14 is fully-seated on the array and re-seat if necessary.


Questions # 9:

An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. How should the Implementation Engineer complete the installation?

Options:

A.

Install a DFS card in PCIe Slot 0 and use these ports for Shelf connectivity.


B.

Install a DFS card in PCIe slot 4 and use it to connect the second DirectFlash Shelf.


C.

Install a DFS card in PCIe slot 3 and use it to connect the second DirectFlash Shelf.


Questions # 10:

After completing an installation, the customer requests to configure replication IP settings. Where in the GUI does the customer need to navigate in order to do this?

Options:

A.

Settings > Network


B.

Storage > Replication


C.

Storage > Array Connections


Viewing page 1 out of 5 pages
Viewing questions 1-10 out of questions