Questions # 41:

A healthcare customer requested that SNMP traps must be sent over the MPLS Layer 3 VPN service. Which protocol must be enabled?

Options:

A.

SNMPv3


B.

Syslog


C.

Syslog TLS


D.

SNMPv2


E.

SSH


Expert Solution
Questions # 42:

A financial company requires that a custom TCP-based stock-trading application be prioritized over all other traffic for the business due to the associated revenue. The company also requires that VoIP be prioritized for manual trades. Which directive should be followed when a QoS strategy is developed for the business?

Options:

A.

Allow VoIP and the custom application to share the same priority queue.


B.

The custom application and VoIP must be assigned their own separate priority queue.


C.

Interleave the custom application with other TCP applications in the same CBWFQ.


D.

Avoid placing the custom application in a CBWFQ queue that contains other traffic.


Expert Solution
Questions # 43:

The goal for any network designer is to strive to build a resilient network that adapts to changing conditions rapidly with minimal impact on the services running over the network. A resilient network can adapt to failures, but which soft failure can be harder to define and detect?

Options:

A.

A network with operational challenges due to lack of skills


B.

A network that is not running in an optimal way


C.

A network which does not solve complexity issues


D.

A network or service that experiences outages


Expert Solution
Questions # 44:

Which design principle improves network resiliency?

Options:

A.

Added load-balancing


B.

Added redundancy


C.

Added confidentiality


D.

Added reliability


Expert Solution
Questions # 45:

Which two actions must merchants do to be compliant with the Payment Card Industry Data Security Standard (PCI DSS)? (Choose two.)

Options:

A.

Conduct risk analyses


B.

Install firewalls


C.

Use antivirus software


D.

Establish monitoring policies


E.

Establish risk management policies


Expert Solution
Questions # 46:

A key to maintaining a highly available network is building in the appropriate redundancy to protect against failure. This redundancy is carefully balanced with the inherent complexity of redundant systems. Which design consideration is relevant for enterprise WAN use cases when it comes to resiliency?

Options:

A.

Design in a way that expects outages and attacks on the network and its protected resources


B.

The design approach should consider simple and centralized management aspect


C.

Design in a way that it simplifies and improves ease of deployment


D.

Design automation tools wherever it is appropriate for greater visibility


Expert Solution
Questions # 47:

A network design includes a long signaling delay in notifying the Layer 3 control plane that an interface has failed. Which two of these actions would reduce that delay? (Choose two.)

Options:

A.

Increase network stability.


B.

Reduce the time for the network to reconverge.


C.

Increase the notification of interface flaps.


D.

Enable lower data link layer recovery systems to have an opportunity to restore the interface.


Expert Solution
Questions # 48:

The Layer 3 control plane steers traffic toward destinations. Which two techniques offer a more dynamic, flexible, controlled, and secure control plane design in service provider networks? (Choose two.)

Options:

A.

Access control lists


B.

Firewalls


C.

QoS policy propagation with BGP


D.

Remote black-holing trigger


E.

Prefix lists


Expert Solution
Questions # 49:

Refer to the exhibit.

Question # 49

The WAN network of the General Bank of Greece has experienced several outages. It takes too long to activate a new branch site. The networking department of the bank plans to upgrade the legacy end-of-life WAN network with a new flexible, manageable, and scalable in-house solution. The number of branches will increase exponentially in the next fiscal year. The CTO states that the bank’s main goal is OPEX reduction. The network engineering team prepares a table to evaluate the available options. Which WAN technology can be used for the solution?

Options:

A.

DMVPN over L3VPN


B.

Managed SD-WAN


C.

SD-WAN over L3VPN


D.

SD-WAN over L2VPN


Expert Solution
Questions # 50:

QUESTION 69 Refer to the exhibit. AJI links are P2P Layer 3. A high availability application is synchronizing data between host A and host B. To increase chance of delivery the same data is sent twice from host A on two different NICs toward the two NICs on host B.

Question # 50

Refer to the exhibit. All links are P2P Layer 3. A high availability application is synchronizing data between Host A and Host B. To increase the chance of delivery, the same data is sent twice from Host A on two different NICs toward the two NICs on Host B.

Which solution must be deployed in the network to ensure that any failure in the network does not trigger data loss on Host B?

Options:

A.

EIGRP with feasible successors


B.

BFD


C.

IP Fast Reroute


D.

Static routes


Expert Solution