Pass the iSQI Performance Testing CTFL-PT_D Questions and answers with CertsForce

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.

The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.

Question

Assuming there is one boarding every 5 minutes, what should be the minimum front-end processing capacity of the system for the "departing passenger* user? It is assumed that there will be 12 peaks or maximums per hour.

SELECT ONE OPTION

Options:

A.

100 * 12 + (60-12) *4.69 = 1,425.12 transactlons/hour


B.

100 « 12 + (60 -12) * (10.42 - 4.69) = 1.475.04 transactions/hour


C.

100 * 12 + (60 -12) * 15.10 = 1,924.80 transactions/hour


D.

100 * 12 + (60 -12) * 10.42 = 1.700.16 transactions/hour


Expert Solution
Questions # 2:

Choose the MOST suitable description of the structure of a performance test script

SELECT ONE OPTION

Options:

A.

The Initialization section Is the section in which everything Is prepared for the main part, the main sections are executed only once, because If It is necessary to repeat any action the whole script or part of it must be repeated and the clean-up section Is the section where the necessary steps are carried out to finish the test correctly.


B.

The clean-up section Is the section in which everything is prepared for the main part In order to comply with the preconditions, the main sections can be executed several times and the completion section is the section that takes care of recording the results In the corresponding repository.


C.

The initialization section Is the section in which everything Is prepared for the main part, the main sections can be executed several times and the finalization section is the section in charge of registering the results In the corresponding repository.


D.

The Initialization section is the section in which everything Is prepared for the main part, the main sections can be executed several times and the clean-up section is the section where the necessary steps are carried out to finish the test correctly.


Expert Solution
Questions # 3:

Select the ONE option that describes the mechanism used to extract metrics associated with deadlocks and multi threading problems

SELECT ONE OPTION

Options:

A.

Direct measurement from a dynamic performance test.


B.

Analysis and elaboration of metrics from a dynamic performance test.


C.

Direct measurement through a performance monitoring tool.


D.

Scan server logs and compile metrics from them.


Expert Solution
Questions # 4:

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2. you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

• Natalie should make a presentation to the business stakeholders In order to explain the performance test plan.

Question

Which ONE of the following options contains information that should be included in Natalie's presentation to the business stakeholders?

SELECT ONE OPTION

Options:

A.

A spike test shall be conducted in a test environment equivalent to the production environment. Passengers shall be removed from the production environment, disassociated and imported Into the test environment.


B.

The cost of the spike test will be in line with the budget submitted by the cloud service provider. The test must take place in the planned timeframe and use the disassociation algorithm, that were previously agreed on.


C.

A performance test will be conducted to verify the management applications capability to support simultaneous, i.e concurrent, request peaks. The objective of this test (spike test) is to check that the system will be able to support the operations.


D.

A spike test shall be conducted in the performance test environment set up by the systems manager. Preparation includes installation from the clone of the virtual machine identified for this purpose.


Expert Solution
Questions # 5:

Choose the VALID description of the ramp-up concept.

SELECT ONE OPTION

Options:

A.

Stage of reaching the stationary state.


B.

Stage of finishing the test.


C.

Stage of exit from a stationary state by increasing the number of concurrent users.


D.

Technique in which the load on the system is increased to a certain value in the shortest possible time.


Expert Solution
Questions # 6:

Identify the correspondences between the aspects (listed from 1 to 4) and factors to be considered(listed from A to D) when selecting performance testing tools.

1.Compatibility.

2.Scalability.

3.Understandability.

4.Monitoring.

1.Level of technical knowledge needed to use the tool.

2.Correlation of the monitoring with the defined transactions.

3.Protocols.

4.Ability to generate load from multiple points of presence.

SELECT ONE OPTION

Options:

A.

1C-2D-3A-4B.


B.

1B-2D-3A-4C.


C.

1D-2C-3A-4B.


D.

1C-2D-3B-4A.


Expert Solution
Questions # 7:

Which ONE of the following mechanisms is used to make the load test represent a load situation in a real production environment?

SELECT ONE OPTION

Options:

A.

Generate load through the Application Programming Interface (API).


B.

Configure environments with multiple points of presence.


C.

Generate load through the User Interface.


D.

Gradually restrict system resources during the load test.


Expert Solution
Questions # 8:

Choose the ONE option that describes the example of a transaction. The scenario for this question is the transfer of an amount of money from one bank account to another.

SELECT ONE OPTION

Options:

A.

Request transfer of X Monetary Units from account K to account P; reduce the balance of account K by X Monetary Units; Increase the balance of account P by X Monetary Units. If the reduction and Increase have been correctly applied, then apply changes.


B.

Request transfer of X Monetary Units from account K to account P; increase the balance of account P by X Monetary Units. If the increase in account P has been correctly applied, then apply changes.


C.

Request transfer of X Monetary Units from account K to account P; decrease the balance of account K by X Monetary Units. If the reduction in account K has been correctly applied, then apply changes.


D.

Request transfer of X Monetary Units from account K to account P; reduce the balance of account K by X Monetary Units; increase the balance of account P by X Monetary Units. If the reduction or increase has been correctly applied, then apply changes


Expert Solution
Questions # 9:

If a performance test is testing the response time of an application to be connected through remote access, which protocol is being used?

SELECT ONE OPTION

Options:

A.

MMS.


B.

RTE.


C.

WSCL.


D.

LDAP.


Expert Solution
Questions # 10:

In which activity of the testing process is the scope of performance testing established?

SELECT ONE OPTION

Options:

A.

Test analysis.


B.

Test design.


C.

Test planning.


D.

Test monitoring and control.


Expert Solution
Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions