Questions # 1:

What is the minimum percentage of efficient lightbulbs that must be installed to claim the measure EEM22 - Efficient Lighting for Internal Areas?

Options:

A.

70%


B.

80%


C.

90%


D.

100%


Expert Solution
Questions # 2:

What are the benefits of using a pool cover that are recognized in EDGE?

Options:

A.

Increase solar control and comfort


B.

Reduce both water and energy demand


C.

Require less maintenance and work from employees


D.

Reduce chemical consumption and that of cleaning products


Expert Solution
Questions # 3:

The calculation of the embodied energy of materials within the EDGE software excludes

Options:

A.

raw materials extraction.


B.

manufacturing of the material.


C.

material wastage during construction.


D.

raw material wastage during manufacturing.


Expert Solution
Questions # 4:

Which of the following BEST describes an EDGE Expert?

Options:

A.

A consultant who can issue a preliminary EDGE certificate


B.

An individual accredited by the EDGE Certifier who can serve as a consultant


C.

An individual who can serve as both an auditor and a consultant upon EDGE Committee approval


D.

An individual accredited by the EDGE Operations and Management Team who can serve as a consultant


Expert Solution
Questions # 5:

Which type of evidence is required at the post-construction stage for the efficiency measure window glazing?

Options:

A.

Design building elevations marking the window glass specifications


B.

Bill of quantities with the specifications for the window glass highlighted


C.

Manufacturer's data sheets showing the make and model, U-value, and SHGC of the installed glass


D.

Window schedule for the building showing the major window glass types if more than one type of glass is present


Expert Solution
Questions # 6:

When must the registration fee be paid?

Options:

A.

Prior to site audit


B.

Prior to registration


C.

After the registration


D.

After certification has been awarded


Expert Solution
Questions # 7:

In the EDGE software, the Base Case selection of external wall materials in hotels relies on information derived from:

Options:

A.

Typical building practices as well as national building performance codes, where they are in existence.


B.

Global building practices as well as international building performance codes, where they are in existence.


C.

Hotel developers' corporate standard specifications, or materials which have been accredited by the hotel industry.


D.

Local building material suppliers who subscribe to EDGE certification for their materials, or are nationally accredited by the local standards authority.


Expert Solution
Questions # 8:

Energy consumption calculations in EDGE are based on:

Options:

A.

Hourly simulation.


B.

Steady state calculations.


C.

Quasi-steady state calculations.


D.

Cooling and heating degree days.


Expert Solution
Questions # 9:

Which of the following user roles is available in the EDGE App for an EDGE project team?

Options:

A.

Project Admin


B.

Project Architect


C.

Project Engineer


D.

Project Auditor


Expert Solution
Questions # 10:

A site audit must take place within how many months of the project’s practical completion date?

Options:

A.

12 months


B.

18 months


C.

24 months


D.

36 months


Expert Solution