The EDGE Auditor’s submission for Preliminary Certification (design stage) must include specific elements to support the recommendation for certification. The EDGE Certification Protocol specifies: "For Preliminary Certification, the EDGE Auditor’s submission must include compliance documents for the selected measures, such as drawings, specifications, and manufacturer’s data sheets, which verify that the design aligns with the self-assessment in the EDGE software. These documents are reviewed by the Certification Provider to confirm eligibility" (EDGE Certification Protocol, Section 3.2: Audit Requirements). Option C, compliance documents for selected measures, directly matches this requirement. Option A (all available design data) is too broad and not required: "Only documents directly related to the selected measures are needed, not all design data" (EDGE Certification Protocol, Section 3.2: Audit Requirements). Option B (Chapter 5 EDGE certification protocol) is incorrect, as this refers to the protocol document itself, not a submission component: "The certification protocol is a reference, not part of the Auditor’s submission" (EDGE Certification Protocol, Section 1.1: Overview). Option D (design audit site visit results) is incorrect, as site visits are not required at the design stage: "Preliminary Certification is based on a desk audit, not a site visit, which occurs at the post-construction stage" (EDGE Certification Protocol, Section 3.3: Certification Decision). Thus, compliance documents (Option C) are required in the submission.
[Reference:EDGE Certification Protocol, Section 3.2: Audit Requirements, Section 3.3: Certification Decision, Section 1.1: Overview., ]
Submit