Two routers R1 and R2 are directly connected through an Ethernet link Both routers are running OSPF. OSPF has been registered with BFD and BFD is running in asynchronous mode with the echo function enabled Which two actions occur that are related to the echo function? (Choose two)
By monitoring the effects of the design variations, you can characterize the relative resilience of the design. Which method involves disturbing the network by removing an active interface and monitoring how the change is handled by the network?
A well-executed network design provides improved performance and efficiency, increased security, and reduced downtime and support costs Which feature helps to achieve resilience in the network?
As more links are added to the network, information and attributes related to the link is added to the control plane, meaning every link that gets added will slow down the convergence of the control plane by some measurable amount of time As a result when additional redundancy is built or added the MTTR will increase too Which risk increases along with the increased MTTR?
Network orchestration enables network administrators to focus on strategic initiatives, innovation, and value-added tasks rather than spending time on manual and repetitive network management activities. Drag and drop the orchestration types from the left onto the corresponding functions on the right. Not all options are used.

An architect receives a business requirement from a CTO that states the RTO and RPO for a new system should be as close as possible to zero. Which replication method and data center technology should be used?
As part of a design solution a consultant needs to describe the trade-offs between different SDN models Drag the characteristics on the left to the correct controller-based network designs on the right in no particular order.

In an OSPF network with routers connected together with Ethernet cabling, which topology typically takes the longest to converge?
Which two statements describe network automation and network orchestration? (Choose two)
The goal of a business continuity plan is to provide exhaustive information about backup sites and disaster recovery services, to specify who is responsible for business continuity planning and recovery efforts, and to define how different teams should respond Plans should also include step-by-step operational strategies to ensure operations during short-term and long-term disruptions Drag and drop the activities from the left onto the corresponding stages on the tight.