Pass the ASQ ASQ certification CQE Questions and answers with CertsForce

Viewing page 2 out of 6 pages
Viewing questions 11-20 out of questions
Questions # 11:

When nonconforming items are found, which of the following actions should be taken first?

Options:

A.

A Retest


B.

Destruction


C.

Identification


D.

Return to supplier


Expert Solution
Questions # 12:

An increase in the overall length of a recently qualified metal component has been observed and the quality engineer suspects that the storage temperature could be a factor that has affected the overall length. Which of the following tools could be used to assess this relationship?

Options:

A.

Affinity diagram


B.

Scatter diagram


C.

Histogram


D.

Cause and effect diagram


Expert Solution
Questions # 13:

Which of the following tools can be used to communicate performance data in time sequence?

Options:

A.

Scatter diagram


B.

Pareto chart


C.

Control chart


D.

Flow chan


Expert Solution
Questions # 14:

Choosing design settings to minimize the effect of noise is a goal of

Options:

A.

robust design


B.

tolerance design


C.

design verification


D.

design for maintainability


Expert Solution
Questions # 15:

When a company is developing a quality information system, the most important factor is the

Options:

A.

needs of the end user of the system


B.

input from the quality department


C.

level of oversight by senior management


D.

method of collecting data used in the system


Expert Solution
Questions # 16:

Which of the following elements describes the combination of the severity and probability of occurrence of harm?

Options:

A.

Failure mode


B.

Hazard


C.

Risk


D.

Detection


Expert Solution
Questions # 17:

In a sample of 2.000 items taken from a large lot. 80 are found to be nonconforming. What is the 95% confidence interval for the proportion of nonconforming items?

Options:

A.

[0.0328. 0.0472]


B.

[0.0314. 0.0486]


C.

[0.0308. 0.0499]


D.

[0.0302. 0.049


Expert Solution
Questions # 18:

Two advantages of process mapping are the ability to

Ⅰ. Visualize the process being described.

Ⅱ. Discover manufacturing problems only.

Ⅲ. Discover quality problems only.

IV. Check current processes for duplication or redundancy.

Options:

A.

I and IV only


B.

II and III only


C.

I and III only


D.

II and IV only


Expert Solution
Questions # 19:

A test-retest study is performed to a coordinate measuring machine (CMM) using a working standard of 100.00 ± 0.001 mm (95% confidence). The length of the standard is measured 30 rimes. The mean and standard deviation of the measurements are x = 107.883 mm and 5 = 2.497 mm. All of the measurements are made are the same location on the standard and are taken by the same technician, who mounts and dismounts the unit for each measurement.

The precision of the CMM is estimated to be

Options:

A.

0.456


B.

2.497


C.

7.833


D.

12.735


Expert Solution
Questions # 20:

Which of the following factors has the most influence on the success of quality initiatives?

Options:

A.

Buy-in at all levels of management


B.

Leadership by quality assurance staff


C.

Cooperation from front-line workers


D.

Deployment of statistical process control


Expert Solution
Viewing page 2 out of 6 pages
Viewing questions 11-20 out of questions