Questions # 11:

Which location typewould earn the maximum points under the Smart Location and Linkage Credit. Preferred Locations Option 1: Location Type?

Options:

A.

An infill site that is not a previously developed site


B.

An infill site that is also a previously developed site


C.

An adjacent site that is also a previously developed site


D.

A previously developed site mat is not an adjacent site or infill site


Expert Solution
Questions # 12:

In ardor to achieve the Neighborhood Pattern and Design Credit. Visit ability and Universal Design. the owner of a new six-unit residential building has decided to incorporate universal design strategies throughout each home. Which of the following features contributes to mat credit?

Options:

A.

Easy-to-reach door knobs


B.

Met on sensors on all faucets


C.

Motion dot tic tor lighting in Bedrooms


D.

Easy-touch rocker or hand-tree switches


Expert Solution
Questions # 13:

The intent of Neighborhood Pattern and Design Credit. Community Outreach and Involvement is to

Options:

A.

promote the health and well-being of the community members.


B.

promote the communication between the developer and the construction team.


C.

provide an educational opportunity for real estate and urban planning students.


D.

encourage responsiveness to those who live or work in the community.


Expert Solution
Questions # 14:

A 10-acre ((our hectare) project has 5.000 ft (1 524 m) of sidewalks Trees and trellises are planned along several ofthose blocks to provide shading for the sidewalks In order to achieve Neighborhood Pattern and Design Credit Tree-Lined and Shaded Streetscapes. what is the minimum shaded sidewalk that would need to be provided?

Options:

A.

1,000 ft. (305 m)


B.

2,000 ft. (610 m)


C.

3,000 ft. (915 m)


D.

4,000 ft. (1 220 m)


Expert Solution
Questions # 15:

For a LEED forNeighborhood Development project thathas yet to earn all land use entitlements, which of thefollowing should the project team pursue to assist with local approvals?

Options:

A.

Site visit by a GBCI representative


B.

Endorsement from local USGBC chapter


C.

LEED for Neighborhood Development: Plan. Letter of Support


D.

LEED Plaque


Expert Solution
Questions # 16:

An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings Prerequisite Construction Activity Pollution Prevention.Which of the following Is an objective of this prerequisite?

Options:

A.

increasing stormwater flow rates off a site


B.

Providing a long term strategy for flood control


C.

Preventing air pollution with dust and particulate matter


D.

Reducing greenhouse gas emissions associated with the project


Expert Solution
Questions # 17:

Which of the following are eligible sources of renewable energy under Green Infrastructure and Buildings Credit. Renewable Energy Production?

Options:

A.

Passive solar heating strategies offsetting heating energy use


B.

Cogeneration of electricity and heat using mill residue biomass


C.

Geothermal energy used in conjunction with a ground-source Moat pump


D.

Photovoltaic energy generation purchased from an off-site location


Expert Solution
Questions # 18:

Which of thefollowing site conditions should be considered in the selection of renewable energy technologies for Green Infrastructure and Buildings Credit. Renewable Energy Production?

Options:

A.

Wind exposure


B.

Distance from a wetland


C.

Annual precipitation levels


D.

Elevation above the 100-year flood plain


Expert Solution
Questions # 19:

A project includes previously developed lotswithin the LEED for Neighborhood Development boundary. For the purpose ofcalculating previously developed site area, which lot size may be consideredto be 100% previously developed?

Options:

A.

0.5 acre (0.2 hectare)


B.

1.5 acres (0.61 hectare)


C.

2 acres (0.81 hectare)


D.

2.5 acres (1.01 hectare)


Expert Solution
Questions # 20:

A standardized base map that should be used throughout the submission to illustrate relevant surrounding features forup to 1 mi.(1.6 km) around the project boundary is a

Options:

A.

special map.


B.

permit map.


C.

vicinity map


D.

project site map.