Which location typewould earn the maximum points under the Smart Location and Linkage Credit. Preferred Locations Option 1: Location Type?
In ardor to achieve the Neighborhood Pattern and Design Credit. Visit ability and Universal Design. the owner of a new six-unit residential building has decided to incorporate universal design strategies throughout each home. Which of the following features contributes to mat credit?
The intent of Neighborhood Pattern and Design Credit. Community Outreach and Involvement is to
A 10-acre ((our hectare) project has 5.000 ft (1 524 m) of sidewalks Trees and trellises are planned along several ofthose blocks to provide shading for the sidewalks In order to achieve Neighborhood Pattern and Design Credit Tree-Lined and Shaded Streetscapes. what is the minimum shaded sidewalk that would need to be provided?
For a LEED forNeighborhood Development project thathas yet to earn all land use entitlements, which of thefollowing should the project team pursue to assist with local approvals?
An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings Prerequisite Construction Activity Pollution Prevention.Which of the following Is an objective of this prerequisite?
Which of the following are eligible sources of renewable energy under Green Infrastructure and Buildings Credit. Renewable Energy Production?
Which of thefollowing site conditions should be considered in the selection of renewable energy technologies for Green Infrastructure and Buildings Credit. Renewable Energy Production?
A project includes previously developed lotswithin the LEED for Neighborhood Development boundary. For the purpose ofcalculating previously developed site area, which lot size may be consideredto be 100% previously developed?
A standardized base map that should be used throughout the submission to illustrate relevant surrounding features forup to 1 mi.(1.6 km) around the project boundary is a