Questions # 21:

For Neighborhood Patternand Design Tree-Lined and Shaded Streetscapes Credit- Option 2 Shaded Sidewalks.what size ofnewly planted trees can be considered in calculating the percentage or shaded sidewalks?

Options:

A.

Crown diameter at time of purchase


B.

Crown diameter at time of planting


C.

Crown din motor five years after planling


D.

Crown diameter 10 years after planting


Expert Solution
Questions # 22:

A project Is planning a new bus service and shelters to service a new community. Which of the following would be required to meet the Neighborhood Pattern and Design Credit. Transit Facilities?

Options:

A.

Provide points of connectivity of 140 street intersections per square mile


B.

Provide a park and ride parking, lot within 150 ft. (46 m) ofthe transit shelter


C.

Display transit schedules and route information at each publictransit stop


D.

Transit agency confirmation that additional weather protected transit shelters will be provided within five years of protect completion.


Expert Solution
Questions # 23:

Which of the following credits or prerequisites requires a calculation ofIntersections per square mile for square kilometer)?

Options:

A.

neighborhood Pattern and Design Credit. Walkable Streets


B.

Smart Location and Linkage Credit,Bicycle Facilities


C.

Neighborhood Pattern and Design Prerequisite,Connected and Open Community


D.

Smart Location and Linkage Credit. Access to Quality Transit


Expert Solution
Questions # 24:

A project team has arranged to use recycled infrastructure components. Thirty percent (30%) by mass ot the new material infrastructure components contain post-consumer recycled content. Ten percent (10%) by mass of the infrastructure is on-site reuse materials.

What Is the minimum additional percentage of recycled content (by mass) that must come from pre-consumer materials?

Options:

A.

0%


B.

10%


C.

20%


D.

25%


Expert Solution
Questions # 25:

What can be omittedfrom the calculation verifying the percentage of reuse of buildings undergoing major renovation?

Options:

A.

Roof decking


B.

Structural floor


C.

Exterior skin and framing


D.

Nonstructural roofing material


Expert Solution
Questions # 26:

Whichof the following innovation proposals is most likely to be successful to achieve Innovation,Option 1:Innovation?

Options:

A.

Including locked, Indoor bicycle storage for 100% of project occupants


B.

Being located next to a 20-mi. (32 Km), award-winning bicycle trail


C.

Distributing leaflets to project occupants about available public transit services nearby


D.

Providing an educational program on the environmental and human health benefits of green neighborhood


Expert Solution
Questions # 27:

What factor determines the percentage of undeveloped land that must remain undisturbed for Green Infrastructure and Buildings Credit. Minimized Site Disturbance?

Options:

A.

Density of the project


B.

intersections per square mile


C.

City land development codes


D.

Covenants, conditions, and restrictions


Expert Solution
Questions # 28:

The LEED for Neighborhood Development project team needs to prepare a flood map as an exhibit tor an upcoming zoningcommissioning meeting. Which ofthe following government agencies provides this data?

Options:

A.

U.S. Environmental Protection Agency (EPA) or local equivalent for protects outside of the U.S


B.

Federal Emergency Management Agency (FEMA) or local equivalent for projects outside of the U.S.


C.

Department of Housing and Urban Development (HUD) or local equivalent for projects outside of the US


D.

U.S. Department of the Interior (DOI) or local equivalent for projects outside of the U.S.


Expert Solution
Questions # 29:

Which of the following can be included within the boundary of a project site on an urban waterfront?

Options:

A.

Dock to be constructed by the developer


B.

House boats in place prior to the issuance of certificate of occupancy


C.

Marina pier in place prior to the date of property acquisition


D.

Jetty with funding for construction prior to the date of certification


Expert Solution
Questions # 30:

A project teamchooses to install highly efficient street lights and traffic lights throughout a 21-acre neighborhood project. Which credit could this efficiency help the team earn?

Options:

A.

Light Pollution Reduction


B.

Renewable Energy Production


C.

infrastructure Energy Efficiency


D.

Optimize Building Energy Performance


Expert Solution