For Neighborhood Patternand Design Tree-Lined and Shaded Streetscapes Credit- Option 2 Shaded Sidewalks.what size ofnewly planted trees can be considered in calculating the percentage or shaded sidewalks?
A project Is planning a new bus service and shelters to service a new community. Which of the following would be required to meet the Neighborhood Pattern and Design Credit. Transit Facilities?
Which of the following credits or prerequisites requires a calculation ofIntersections per square mile for square kilometer)?
A project team has arranged to use recycled infrastructure components. Thirty percent (30%) by mass ot the new material infrastructure components contain post-consumer recycled content. Ten percent (10%) by mass of the infrastructure is on-site reuse materials.
What Is the minimum additional percentage of recycled content (by mass) that must come from pre-consumer materials?
What can be omittedfrom the calculation verifying the percentage of reuse of buildings undergoing major renovation?
Whichof the following innovation proposals is most likely to be successful to achieve Innovation,Option 1:Innovation?
What factor determines the percentage of undeveloped land that must remain undisturbed for Green Infrastructure and Buildings Credit. Minimized Site Disturbance?
The LEED for Neighborhood Development project team needs to prepare a flood map as an exhibit tor an upcoming zoningcommissioning meeting. Which ofthe following government agencies provides this data?
Which of the following can be included within the boundary of a project site on an urban waterfront?
A project teamchooses to install highly efficient street lights and traffic lights throughout a 21-acre neighborhood project. Which credit could this efficiency help the team earn?