USGBC LEED AP Neighborhood Development (LEED ND) LEED-AP-ND Question # 16 Topic 2 Discussion

USGBC LEED AP Neighborhood Development (LEED ND) LEED-AP-ND Question # 16 Topic 2 Discussion

LEED-AP-ND Exam Topic 2 Question 16 Discussion:
Question #: 16
Topic #: 2

An Erosion and Sedimentation Control Plan Is required to achieve Green infrastructure and Buildings Prerequisite Construction Activity Pollution Prevention.Which of the following Is an objective of this prerequisite?


A.

increasing stormwater flow rates off a site


B.

Providing a long term strategy for flood control


C.

Preventing air pollution with dust and particulate matter


D.

Reducing greenhouse gas emissions associated with the project


Get Premium LEED-AP-ND Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.