Questions # 1:

A square site with four equally sized neighboring parcels isbeing considered for a LEEDfor Neighborhood Development project.Consider the following: on the north side of the site is forest land; on the east side Is a church located on a parcel that is 100% developed: and on the south side is a schoollocated on a parcel that is 50% developed. Which one of the following uses on the west side would make this an infill site?

Options:

A.

A parcel that is 100% farmland


B.

A library on a parcel that is 75% developed


C.

A market on a parcel that is 50% developed


D.

A post office on a parcel that is 25% developed


Expert Solution
Questions # 2:

Which of thefollowing strategies comply with Neighborhood Pattern and Design Credit,Community Outreach and Involvement?

Options:

A.

Host a public hearing to solicit input after preliminary design


B.

Conduct a one day design charrette including property owners, residents, business owners and workers


C.

Establish ongoing communication channel between developer and community during the design and construction process


D.

Invite local businesses, residents and community planners and other stakeholder's to a meeting held at the siteto review the plan after it has been completed


Expert Solution
Questions # 3:

The LEED for Neighborhood DevelopmentRating System considers which ofthe following to be a circulation network?

Options:

A.

Dedicated rights-of-way for fixed-rail transit service


B.

Entrance and exit ways for vehicular use into and out of parking lots or structures


C.

All motorizednon-motorized and mixed-mode travel ways permanently accessible in thepublic


D.

Spaces dedicated to non-motorized travel for project occupants to use for travel between buildings


Expert Solution
Questions # 4:

A brand new communityis being constructed on a greenfield site. In order to reduce energy consumption, a district heating and cooling system will be built Which or thefollowing may be excluded from the system to achieve Green Intra structure and Buildings Credit. District Heating and Cooling?

Options:

A.

Schools


B.

Hospitals


C.

Multi-family buildings


D.

Single-family residences


Expert Solution
Questions # 5:

A projectsite Includes 3.500 ft. (1.067 m) of streets, excluding driveways and utility vaults. How many street trees must be planted to meet the minimum requirements or Neighborhood Pattern and Design Credit. Tree-Lined and Shaded Streetscapes. Option 1: Tree-Lined Blocks?

Options:

A.

27 trees


B.

30 trees


C.

38 trees


D.

42 trees


Expert Solution
Questions # 6:

A project team has determined that achieving Green Infrastructure and Buildings Credit. Solar Orientation is feasible Based on a preliminary assessment of site features, sunlight and shading, themaximum solar access has been determined. What is the next step the project needs to take to incorporate optimum solar orientation into the site design?

Options:

A.

Determine whether each building can be designed within 15 degrees of geographical east-west


B.

Review local and federal tax incentives and incorporate the monetary value of incentives into the protect budget and site design


C.

Determine the total building square footage in the project and identify all buildings where one axis is at least 2.5 times longer than the others


D.

Study building envelopes and daylighting opportunities for planned development and adjust construction documents to reflect optimum solar orientation


Expert Solution
Questions # 7:

A mixed-use project without transit service has the following characteristics:

* 55 townhomes on 9 acres (3.6 hectares) of buildable land

* 44.000 ft2 (4.088 m2) of commercial building on 87.120 ft2(9.094.m2) Of buildable land

What should be added to the development plan to meet the minimum density requirements for Neighborhood Pattern and Design Prerequisite Compact Development?

Options:

A.

Four dwelling units


B.

Eight dwelling units


C.

12.220 ft2(1.135 m2) of commercial space


D.

130.000 ft2 (12 077 m2) of commercial space


Expert Solution
Questions # 8:

A project site would automatically comply with Smart Location and Linkage Prerequisite. Wetland and Water Body Conservation if the project site is

Options:

A.

An infill site


B.

An adjacent site


C.

A brownfield redevelopment.


D.

On previously distributed land


Expert Solution
Questions # 9:

An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve SmartLocation and Linkage Credit. Steep Slope Protection, what possible percentage ofthe site could be developed?

Options:

A.

50%


B.

65%


C.

75%


D.

90%


Expert Solution
Questions # 10:

What Is the existing or granted right to use property for specific types and quantities of land uses?

Options:

A.

Entitlement


B.

Building Permit


C.

Development Agreement


D.

Certificate of Occupancy