A customer has a FlashBlade and wants to use it to store data for an application that runs on Linux. The FlashBlade has four Data VIPs and is connected with four 40Gbe links connected to the Top-of-Rack switch in a virtual port-channel with trunking enabled. The Linux host has a single 40Gbe NIC and is configured with a single mount point located at /mnt/appdata. nconnect is not enabled.
What is the maximum throughput the customer should expect when reading data from the mount point?
What is the recommended number of power cables for a multi-chassis FlashBlade configuration with 4 chassis?
Which of the following benefits does FlashBlade SafeMode offer?
A customer has an application that needs to prioritize speed for untrusted applications to put large numbers of files on an NFS export. Which NFS Export options should be used?
After revising Cloud-First strategy, a customer’s CFO asks an architect to recommend which workloads should be moved to FlashBlade.
Which two workloads will be successful on FlashBlade? (Select two.)
A customer provides a diagram and reports no complaints about backup completion times. The customer is concerned about the complexity of the environment.
What is the illustrated pain point?
A customer is interested in deploying Splunk for their infrastructure logs. They will not be replicating the Splunk environment to another site, anticipate a 2TB per day ingest rate, and want to be able to easily scale their indexers independent of their storage.
How should the architect recommend that the customer deploy Splunk?
For auditing and security purposes, a customer needs to lock down the ‘pureuser’. Each storage admin must log in with their own account.
Which command should the architect run first after all external preparations have been completed?
A FlashBlade is designed with a properly implemented single 4x40Gb/s LAG.
During implementation, the architect is informed that the ISL on the uplink switches in broken. The customer has no budget to repair or replace it. What should the architect do?
The customer reports that the end clients shown in the diagram are NOT completing jobs on time. Each client writes 300MB/s to the FlashBlade for 45 minutes every hour, and they run concurrently. What does the architect need to do?