Questions # 11:

When the main power is disconnected, how long should a power supply with emergency voice communication systems work in alarm mode?

Options:

A.

Maximum of 5 minutes


B.

Maximum of 15 minutes


C.

Minimum of 5 minutes


D.

Minimum of 15 minutes


Expert Solution
Questions # 12:

What must be done if the frequency of sensitivity testing is extended to 5 years?

Options:

A.

Detectors must be from the same manufacturer.


B.

Detectors must be located in the same area.


C.

Records of nuisance alarms shall be maintained.


D.

Records of serial numbers shall be maintained.


Expert Solution
Questions # 13:

The inspection phase, as opposed to the testing phase, of system control equipment should concentrate on which of the following tasks?

Options:

A.

Activation of all initiating devices


B.

Operational reliability only


C.

Proof of signals at monitoring facility


D.

Visual inspection only


Expert Solution
Questions # 14:

What is the periodic testing frequency of a control valve switch?

Options:

A.

Monthly


B.

Quarterly


C.

Semiannually


D.

Annually


Expert Solution
Questions # 15:

When is the elevator recall permitted to send a supervisory signal in lieu of an alarm signal?

Options:

A.

Where approved by the authority having jurisdiction


B.

Where approved by the building owner


C.

Where approved by the insurance company


D.

Where approved by the system designer


Expert Solution
Questions # 16:

Which of the following options is required while conducting annual testing of an audiovisual device?

Options:

A.

Confirm sound level based on design


B.

Confirm voice intelligibility


C.

Verify proper operation


D.

Verify proper setting of candela rating


Expert Solution
Questions # 17:

When testing a room temperature switch, below what temperature does the off-normal signal occur?

Options:

A.

32 °F (0.0 °C)


B.

40 °F (4.4 °C)


C.

45 °F (7.2 °C)


D.

50 °F (10.0 °C)


Expert Solution
Questions # 18:

When is a shunt trip operated to power down an elevator?

Options:

A.

When a heat detector is tripped


B.

When a pull station is activated


C.

When a smoke detector is tripped


D.

When a sprinkler head is activated


Expert Solution
Questions # 19:

How often should radio transmitters be inspected?

Options:

A.

Monthly


B.

Quarterly


C.

Semiannually


D.

Annually


Expert Solution
Questions # 20:

Load testing of the control unit's VRLA batteries reveals that they must be replaced. Which two of the following are requirements for the replacement of VRLA batteries? (Choose two.)

Options:

A.

Batteries shall be approved by the authority having jurisdiction.


B.

Batteries shall be listed by a nationally recognized testing laboratory.


C.

Batteries shall be marked with the month and year of manufacture.


D.

Batteries shall be the same make and model as those being replaced.