Pass the ISTQB Foundation Level CTFL-Foundation Questions and answers with CertsForce

Viewing page 3 out of 9 pages
Viewing questions 21-30 out of questions
Questions # 21:

During the development of a software change for a system, the developer makes a mistake in his work, which leads to a fault in the code. Unfortunately the fault is not found by software testing and is released into live.

What is the definite consequence of this mistake?

Options:

A.

The system will fail, causing a defect


B.

If the defect is executed, the system may fail


C.

Loss of money, time, or business reputation


D.

Contractual requirements have not been met by testing


Expert Solution
Questions # 22:

A live defect has been found where a code component fails to release memory after it has finished using it.

Which of the following tools would have been the MOST effective at detecting this defect prior to live implementation?

Options:

A.

Dynamic analysis tool


B.

Monitoring tool


C.

Configuration management tool


D.

Coverage measurement tool


Expert Solution
Questions # 23:

A system is being enhanced to simplify screen navigation for users.

Which of the following does NOT reflect structural testing?

Options:

A.

To test all paths that users could take through the screen menu system


B.

To ensure that 100% decision testing is achieved for each system component


C.

To test all branches of component calls within the application call graph


D.

To ensure that users can navigate to all fields on the screen


Expert Solution
Questions # 24:

A new testing tool has been selected for an organisation and a pilot project has successfully completed. The next step is to deploy the tool within the organization.

What is a key success factor in tool deployment?

Options:

A.

Estimate a cost-benefit ratio based on a firm business case


B.

Determine whether benefits will be achieved at reasonable cost


C.

Provide support for the test team using the tool


D.

Assessment of organisational maturity, strengths and weaknesses


Expert Solution
Questions # 25:

Which of the following type of defect would NOT be typically found by using a static analysis tool?

Options:

A.

A variable is defined but is then not used


B.

A variable is used in a calculation before it is defined


C.

A variable has the wrong numeric value passed into it


D.

A variable is used but not declared


Expert Solution
Questions # 26:

Which of the following is a Black Box test design technique?

Options:

A.

Decision Coverage


B.

Error Guessing


C.

Statement Coverage


D.

Equivalence Partitioning


Expert Solution
Questions # 27:

Which option BEST describes how the level of risk is determined?

Options:

A.

The likelihood of an adverse event happening multiplied by the cost of preventing it


B.

The consequences of a potential problem multiplied by the cost of possible legal action


C.

The impact of an adverse event multiplied by the likelihood of that event occurring


D.

The likelihood and the probability of a hazard occurring


Expert Solution
Questions # 28:

Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels. Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met? [K2]

a. Regression tests run and passed in systems testing

b. Incidents closed in systems testing

c. Planned tests run and passed in system testing

d. Planned tests run and passed at all levels of testing

e. Incidents raised and closed at all levels of testing

Options:

A.

a and e


B.

b and c


C.

d and e


D.

a and b


Expert Solution
Questions # 29:

Of the following, select the best description of the fundamental test process:

Options:

A.

Planning and control, analysis, design, implementation, execution, evaluation of exit criteria and reporting, test closure.


B.

Executing tests, identifying and recording defects and preparing recommendation and closure reports.


C.

Controls, preparation of test cases, execution of test cases, execution of regression packs, communicating with developers, writing recommendations for release.


D.

Static testing, dynamic testing, defect reporting, reporting and closure.


Expert Solution
Questions # 30:

Test script TransVal 3.1 tests transaction validation via screen TRN 003B. According to the specification (PID ver 1.3 10b iv) the validation screen should not accept future dated transactions. Test script TransVal 3.1 passes. Test script eod 1.4 tests end of day processing and is run after the execution of TransVal 3.1 using data entered during that test

Which of the following is the BEST detail on an incident report? [K3]

Options:

A.

Title. End of Day failure.. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached.


B.

Title. Transaction input screen validation..Reproducible. Yes. Description. Script eod 1..4 fails . Screen shot of the failure attached. Validation of transaction entryon screen TRN-003B should not allow future dated transactions – see PID ver 1.3 para 10b iv.


C.

Title. Screen TRN-003B validation of transaction date.. Reproducible. No. Description. When a future dated transaction is processed by the end of day process, a failure can occur. This does not always happen. Screen shot of the failure attached.


D.

Title. Screen TRN-003B validation of transaction date. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached. Validation of transaction entry on screen TRN-003B should not allow future dated transactions – see PID ver 1.3 para 10b iv.


Expert Solution
Viewing page 3 out of 9 pages
Viewing questions 21-30 out of questions