Spring Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Pass the International Code Council Commercial Inspector M2 Questions and answers with CertsForce

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

What is the minimum distance required between a combustion air opening at the exterior of a building and a lot line?

Options:

A.

2 feet


B.

3 feet


C.

8 feet


D.

10 feet


Expert Solution
Questions # 2:

When a furnace is installed in a 66-inch-high attic, the maximum distance from the passageway access to the furnace shall be _____ ft., measured along the centerline of the passageway.

Options:

A.

10


B.

15


C.

20


D.

50


Expert Solution
Questions # 3:

When a permit is issued, the code requires that one set of approved plans and specifications be returned to the applicant.

This set of plans and specifications shall be:

Options:

A.

kept on the building site.


B.

returned to the architect.


C.

filed with the county clerk or jurisdiction to properly record the property.


D.

retained by the applicant for at least one year after the job is finished in the event modifications are made.


Expert Solution
Questions # 4:

The exhibit shows a _____ in. diameter gas line between unit heaters 5 and 8.

Question # 4

Options:

A.

3/4


B.

1


C.

1-1/8


D.

1-1/4


Expert Solution
Questions # 5:

Infrared radiant heaters shall be installed:

Options:

A.

in accordance with UL 2158.


B.

in accordance with UL 1240.


C.

with a 6-ft. clearance on all sides.


D.

with clearances from combustible material in accordance with the manufacturer’s installation instructions.


Expert Solution
Questions # 6:

The exhaust outlet for a clothes dryer is required to be equipped with:

Options:

A.

a backdraft damper.


B.

an automatically controlled volume damper.


C.

a corrosion-resistant screen of 1/4-inch mesh.


D.

a temperature limit control device that will automatically shut off the system at a temperature of 250°F.


Expert Solution
Questions # 7:

Unless listed for a greater or smaller dimension, mechanical draft venting systems shall terminate a minimum of _____ feet below an openable window.

Options:

A.

1


B.

4


C.

8


D.

12


Expert Solution
Questions # 8:

Why are two or more sets of construction documents, engineering calculations, diagrams, and other data required to be submitted with each application for a permit?

Options:

A.

To ensure that the project is completed in a timely manner.


B.

All sets are to be retained by the code official in order to have a spare set of construction documents for use by any subcontractors.


C.

All sets of documents are to be kept by the code official, and at least one set will serve as a backup set of documents in case the other is lost or misplaced.


D.

One set will be retained by the code official, and the other will be returned to the applicant and kept on the job site for reference while construction is in progress.


Expert Solution
Questions # 9:

Given: A recirculating industrial direct-fired makeup air heater has a rated input of 200,000 Btu/h . Ventilation air is supplied by separate mechanical means.

Outside ventilation air shall be provided to supply at least _____ CFM.

Options:

A.

250


B.

400


C.

800


D.

1250


Expert Solution
Questions # 10:

What is the maximum distance allowed below the design flood elevation from which ventilation may be obtained?

Options:

A.

0 inches


B.

6 inches


C.

1 foot


D.

2 feet


Expert Solution
Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions