Questions # 11:

To test for tightness, a consumer’s gas piping should never be filled with:

Options:

A.

air.


B.

dry air.


C.

oxygen.


D.

inert gas.


Expert Solution
Questions # 12:

An 8-inch Type B venting system with a listed vent cap must terminate a minimum of _____ feet above the flat roof through which it passes.

Options:

A.

1


B.

2


C.

4


D.

5


Expert Solution
Questions # 13:

Pipe and duct insulation can be used within plenums except:

Options:

A.

where the assembly has been tested to UL 723.


B.

where the flame spread index is not more than 25.


C.

where the assembly has been tested to ASTM B84.


D.

where the assembly has been tested to ASTM E84.


Expert Solution
Questions # 14:

When testing dampers located in corridors, the dampers shall demonstrate acceptable closure performance when subjected to _____ fpm velocity across the face of the damper using the UL 555 fire exposure test.

Options:

A.

75


B.

100


C.

150


D.

200


Expert Solution
Questions # 15:

The minimum size for access openings for fire dampers shall be:

Options:

A.

the same as the dimension of the duct.


B.

one-half the diagonal of the access opening.


C.

adequate to permit maintenance and resetting of the damper.


D.

12 inches by 12 inches.


Expert Solution