Questions # 11:

From the options indicated, what is the correct starting point for the raised floor installation?

Question # 11

Options:

A.

Point A


B.

Point B


C.

Point C


D.

Point D


Questions # 12:

An air-conditioner unit needs to be selected. Two types are available:

Unit-A has a Sensible Heat Ratio (SHR) of 0.7.

Unit-B has a Sensible Heat Ratio (SHR) of 0.9.

From an efficiency point of view, which one should be selected?

Options:

A.

It does not matter, as the Sensible Heat Ratio has nothing to do with efficiency.


B.

Not relevant, as Sensible Heat Ratio is only specified for air-conditioner equipment to indicate the ratio between intake temperature and exhaust temperature.


C.

Unit A


D.

Unit B


Questions # 13:

Three data centers are benchmarked on facilities energy efficiency.

Data center A has achieved a PUE of 2.45.

Data center B has achieved a PUE of 1.20.

Data center C has achieved a PUE of 1.90.

Which of the data centers is operating at the highest facility efficiency?

Options:

A.

PUE does not indicate efficiency


B.

Data center A


C.

Data center B


D.

Data center C


Questions # 14:

What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire extinguishing system?

Options:

A.

It can only be used in computer rooms which have sufficient air changes per hour.


B.

The gas containers need to be close to the hazard area.


C.

It can only be used in non-continuous occupied areas.


D.

It can only be used in computer rooms where you have sufficient positive pressure.


Questions # 15:

A new network storage device in a non-standard size rack of approximately 600 kg/1,300 lbs is going to be installed in the data center.

Are new floor loading calculations required?

Options:

A.

No, as long as the equipment is less than 700 kg/1,500 lbs it will be within the limits.


B.

No, specifications of equipment brought into the data center will already be known during the design of the data center, and therefore the floor will be able to handle it.


C.

Yes, additional floor loading calculations need to be done by the floor manager, which should be verified by the safety engineer.


D.

Yes, a structural engineer, approved/endorsed by the building owner, should carry out new floor loading calculations.


Questions # 16:

The electrical diagram of the data center shows the following UPS configuration and has a load of 80 kW.

What is the set-up in this data center?

Options:

A.

2+N+1


B.

2(N+1)


C.

N+N(+1)


D.

(N+1)-(N+1)


Questions # 17:

When designing a data center network, your company wants to minimize the number of network switches to manage.

What type of physical cabling layout would be the best choice?

Options:

A.

ToR (Top of Rack) design


B.

EoR (End of Row) design


C.

Star network design using coaxial cables


D.

It does not matter as the number of switches is not influenced by the physical cabling layout


Questions # 18:

You are working on the design of a new facility. The electrical riser of the building with high current power is located close to the area where sensitive IT equipment in the computer room will be located.

What should you recommend to reduce the amount of EMF coming from the electrical riser?

Options:

A.

Install single-phase power cabling


B.

Install three-phase power cabling based on three individual core wires


C.

Install bus bar trunking


D.

Install three-phase power cabling based on a combined cable (e.g. XLPE etc.)