Question #: 71
Topic #: 8

A civil engineer would like to incorporate strategies for rainwater management in order to prevent the flooding occurring at the project site. Which design technique should be used to help prevent stormwater damage to the building and surrounding site?


A.

Install a bioswale


B.

Direct runoff into a stream


C.

Pave the site with high Solar Reflectance Index (SRI) material


D.

Pave the site with impervious material