The correct answers are C, D, E, and F . Selecting an in-person VM workshop room is a Preparation Phase responsibility because the facilitator must create conditions that support team interaction, visible work products, and uninterrupted execution of the Job Plan. The SAVE Study Guide identifies Pre-Workshop activities as planning and organizing the Value Study, including determining “study dates, times, location and other logistical needs.” ( ) It also emphasizes that the VM Job Plan supports team synergy through a structured process, not isolated individual opinions. ( )
A U-shaped table arrangement supports facilitation because participants can see one another, engage in discussion, and view flip charts or projected material. Availability for the full workshop duration is essential because the Study Guide notes that sufficient time must be allotted to apply the VM process and document findings; losing the room interrupts phase continuity. ( ) Windows and wall space matter because VM workshops rely heavily on posted functions, FAST diagrams, idea lists, evaluation matrices, and proposal development materials. Temperature controls are also important because an uncomfortable environment reduces concentration and participation during long workshop sessions. Chair comfort and site proximity may be useful, but they are secondary compared with room layout, uninterrupted access, display/workspace, and environmental control.
References/topics: Preparation Phase; Pre-Workshop Logistics; VM Facilitation; Workshop Environment; Team Dynamics.
Submit