H19-371_V1.0 Exam Topic 9 Question 89 Discussion:
Question #: 89
Topic #: 9

Configure the UPS system scheme, which of the following factors need to be considered in the calculation scheme ( )


A.

UPS type, capacity and parallel mode


B.

The brand and capacity of the battery


C.

Make and model of AC and DC cables


D.

Configuration of battery rack and battery switch box