Questions # 1:

When a system is configured with a battery backup time of 15 minutes, the discharge termination voltage of the battery cell should be selected ()

Options:

A.

1.60V


B.

1.67V


C.

1.75V


D.

1. 80V


Questions # 2:

The NetEco6000 management system can provide the temperature cloud map function to realize the identification of cold and hot spots in the computer room. How many layers does the temperature cloud map support?

Options:

A.

Single layer


B.

Double layer


C.

Three floors


D.

Fourth floor


Questions # 3:

UPS2000-G-(6K-20K) maintenance bypass implementation ()

Options:

A.

Mainframe built-in maintenance bypass


B.

Optional PDU to support maintenance bypass


C.

Cannot support maintenance bypass


Questions # 4:

FusionModule500&FusionModule800 display brand optional ()

Options:

A.

Blu-ray


B.

Huawei Honor


C.

apple


D.

Samsung


Questions # 5:

What is the size of the screen of the air conditioner of FusionModule2000?

Options:

A.

10 inches


B.

7 inches


C.

5 inches


D.

9 inches


Questions # 6:

What is the size of the screen of the air conditioner of Fusionmodule2000? ( )

Options:

A.

5 inches


B.

7 inches


C.

9 inches


D.

10 inches


Questions # 7:

UPS2000-G-(6K-20K) has a strong lightning protection design in the industry, lightning protection level (), surge protection level 0), which can avoid 90% failures caused by lightning strikes and

reliably protect the back-end equipment. AC input port.

Options:

A.

5kA; 6kV


B.

2kA; 4kV


C.

2kA; 6kV


D.

4kA; 6kV


Questions # 8:

If the length of the connecting pipes between the indoor and outdoor units of the FusionModule800 air conditioner is less than how many meters, there is no need to charge refrigerant? (

Options:

A.

30


B.

50


C.

10


D.

20


Questions # 9:

Is the channel type of the typical configuration of FusionModule800 a cold aisle or a hot aisle? ()

Options:

A.

Hot and cold aisle


B.

Hot Aisle


Questions # 10:

How many cabinets can a single row of FusionModule2000 support? (

Options:

A.

48


B.

12


C.

36


D.

24


Questions # 11:

What is the system efficiency of UPS5000-E ()?

Options:

A.

96%


B.

97.1%


C.

96.5%


D.

97.5%


Questions # 12:

The row-level chilled water intelligent temperature control product NetCol 5000-C032H adopts the form of running pipes ( )

Options:

A.

Up the tube


B.

Down the tube


C.

Pipe up and down


D.

Side run.


Questions # 13:

What is the maximum power of the IT cabinet of FusionModule500&FusionModule800?

Options:

A.

3KVA


B.

5KVA


C.

7KVA


D.

9KVA


Questions # 14:

2.4mvaFusionPower6000 power module length is ( ).

Options:

A.

14m


B.

14.80m


C.

13m


D.

13.08m


Questions # 15:

The wrong description about the reliability of NetCol5000-C row-level air conditioner is: ().

Options:

A.

It adopts dual power supply, and the two power supply adopts automatic switching mode


B.

Large-scale data centers such as operators and large corporate headquarters are more popular with such air conditioners. .


C.

More application of SMEs Netcp15000-A air conditioner multi-fan air supply: online maintenance is possible.


D.

Cannot be used in scenarios without raised floor, because condensate drainage cannot be connected to the pipe


Viewing page 1 out of 13 pages
Viewing questions 1-15 out of questions