Big Halloween Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Cisco Implementing and Administering Cisco Solutions (200-301 CCNA) v1.1 200-301 Question # 336 Topic 34 Discussion

Cisco Implementing and Administering Cisco Solutions (200-301 CCNA) v1.1 200-301 Question # 336 Topic 34 Discussion

200-301 Exam Topic 34 Question 336 Discussion:
Question #: 336
Topic #: 34

All physical cabling is in place. A company plans to deploy 32 new sites.

The sites will utilize both IPv4 and IPv6 networks.

1 . Subnet 172.25.0.0/16 to meet the subnet requirements and maximize

the number of hosts

Using the second subnet

• Assign the first usable IP address to e0/0 on Sw1O1

• Assign the last usable IP address to e0/0 on Sw102

2. Subnet to meet the subnet requirements and maximize

the number of hosts

c Using the second subnet

• Assign an IPv6 GUA using a unique 64-Bit interface identifier

on e0/0 on Sw101

• Assign an IPv6 GUA using a unique 64-Bit interface identifier

on eO/O on swi02

Guidelines

This is a lab item in which tasks will be performed on virtual devices.

• Refer to the Tasks tab to view the tasks for this lab item.

• Refer to the Topology tab to access the device console(s) and perform the tasks.

• Console access is available for all required devices by clicking the device icon or using

the tab(s) above the console window.

• All necessary preconfigurations have been applied.

• Do not change the enable password or hostname for any device.

• Save your configurations to NVRAM before moving to the next item.

• Click Next at the bottom of the screen to submit this lab and move to the next question.

• When Next is clicked, the lab closes and cannot be reopened.

200-301 Question 336


Get Premium 200-301 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.